Information
-
Project/Job #
-
Project/Job
-
Conducted on
-
Prepared by
-
Location
-
Personnel
BEHAVIOR
-
TSSP reviewed and signed
-
TSSP for each task?
-
Mentors assigned?
-
Task Hazard Boards Complete
WORK AREAS
-
General Housekeeping
-
Walking - Working Surfaces
-
Unprotected Sides or Holes
-
Impalement Hazards
-
Material Storage/Lay Down
-
Conex, Box 4 U, Gang Box
PERSONAL PROTECTIVE EQUIPMENT
-
Hard Hats
-
Safety Glasses with Side Shields
-
Face Shield / Goggles (If Required)
-
Respiratory Protection (If Required)
-
Hearing Protection (If required)
-
Clothing (FRC etc. if required)
-
Gloves
-
Foot Protection
FALL PROTECTION
-
Worn Properly
-
Suitable Anchorage Points
-
Inspected/Color Coded
LADDERS
-
Base/Footing/Set Up
-
Proper Type for Task
TOOLS AND EQUIPMENT
-
In Good Condition
-
Inspected/Color Coded
-
Right Tool for the Task
EXCAVATIONS
-
Access/Egress
-
Shoring/Shielding/Sloping
-
Barricades
-
Spoil Pile
ELECTRICAL
-
G.F.C.I.'s
-
Extension Cords
-
Power Tools
EQUIPMENT
-
Equipment Inspections
-
Flagman with Vest
-
Proper setup and use
PEOPLE
-
Behavior
-
Struck by/Caught in/between
-
Proper Lifting
COMMENTS/RECOMMENDATIONS
-
Enter any corrective actions that will be undertaken
SIGN OFF
-
Leadership/Support Representative
-
Production Leader
-
Construction Supervisor
-
Field Hourly Rep / Others
-
Field Hourly Rep / Others
-
Field Hourly Rep / Others