Audit Title
-
Conducted on
-
Project Name
-
Project Number
-
Location
-
Inspected by
-
Additional Personnel
-
List all Subcontractors currently on site.
PREVIOUS INSPECTION
-
All previous issues have been addressed
REQUIRED DOCUMENTATION
-
OSHA Postings in Place
-
OSHA 300 Posted (Applies from Feb. 1 to May 1 only)
-
Worker's Comp Posters
-
Safety Program
-
Haz.Com / MSDS
-
SWPPP
-
Certificates of Insurance
-
Emergency Telephone List
-
Emergency Action Plan
-
Safety Meetings Documented
-
HAZCOM Training Documented.
-
Specialized Training Documented
SITE / MISCELLANEOUS
-
First Aid Kit on Site
-
Persons Trained in First-aid/CPR
-
Fire Extinguishers in Place and Charged (Around Site and Near to any Flammable Source)
-
Chemicals / Flammable Materials Properly Stored
-
All Hazardous Materials Properly Labeled
-
Warning Signs Prominently Displayed
-
Notices Posted at Entrances
-
Fuel Containments being Used and Kept Up
-
High Pressure Gas Cylinders Chained in Place
-
Fences Intact and Gates Lockable
HOUSEKEEPING
-
Job Site Free of Accumulated Trash and Debris
-
Dumpsters on Site for Waste
-
Passageways and Walkways Clear
-
Forms and Materials Free of Protruding Nails and Screws
-
Portable Toilets Clean
-
Cups for Water Drinking Properly Stored / Trash Can for Cups
-
Construction Materials Properly Stacked and Not Scattered
-
Spills, Leaks or Other Hazards observed?
PERSONAL PROTECTIVE EQUIPMENT
-
Everyone Wearing Hardhats
-
Safety / Work / Hard Toe Boots
-
Safety Glasses / Goggles / Face Shields as Required
-
Respirators / Dust Masks
-
Hearing Protection if Required
EXCAVATIONS
-
Competent Person on Site
-
Have Underground Utilities Been Located
-
Trenches / Excavations Properly Barricaded or Covered
-
Trench Protection for Excavations 5' Deep or Over
-
Ladders Properly Located to Surface (No more than 100' apart)
ELECTRICAL
-
Ground Fault System Operational and Being Used by All Contractors
-
Portable Generators GFCI Protected
-
All Extension Cords Marked With Owner's Name
-
Extension Cords in Good Condition
-
Power tools in Good Condition / Ground Prong in Place
-
Lighting Suitable for Work Areas
-
All Electrical Boxes Properly Covered
PORTABLE HAND TOOLS
-
Operators Properly Trained (Including powder actuated tools)
-
Powder Strips Picked Up
-
Cord and Tool in Good Condition
-
Guards In Place Where Required
-
Operators Wearing Personal Protective Gear
MATERIAL HANDLING / FORKLIFTS / HEAVY EQUIPMENT
-
Forklifts / Loaders in Operational Condition
-
Back-Up Alarms Working
-
Operators Properly Trained
-
Seat Belts Being Used by All Operators
-
Only Operator Riding on Equipment
-
Rollover Protection
-
Hoists / Elevators in Operational Condition
Mobile Lifts
-
Scissor lift safety chain installed and being used?
-
Snorkel lift operator certified?
-
Safety harness being used as required? (Always required in snorkel type lifts)
CRANES
-
Daily Crane Inspections
-
Operator Properly Trained
-
Swing Radius Properly Identified
-
Tag Line in Use
-
Chokers, Cables, Hooks in Good Condition
FALL PROTECTION (HEIGHTS OF 6 FT. OR MORE)
-
Guardrails in Place
-
All Guards and Rails Sufficient for Weight
-
Personal Fall Arrest System Being Used When Required
-
Harnesses in Good Condition with Proper Label
-
Openings in Floors and Roof Protected
-
Handrails on Stairs
-
Openings in Walls Protected
-
Impalement Prevention Devices in Place
LADDERS
-
Ladders extended 3 ft. Above landing
-
Ladder Tied Off
-
Field Ladders Properly Constructed
-
Commercial Ladders in Working Condition
-
Ladder Suitable for Job
-
Extension Ladders Properly Joined, Secured in Place at Top and Bottom
-
Adequate to Support Intended Use
SCAFFOLDS
-
Competent Person on Site
-
All Components Appear Damage Free
-
Ladder Provided
-
Proper Foundation and Footing
-
Working Levels Fully Planked / Proper Planking
-
Properly Secured - Tied Off at Required Intervals
-
Rails and Toe Boards Where Required
-
Rolling / Moveable Units Properly Supported
WELDING & CUTTING
-
Leads and Connections in Good Condition
-
Hoses in Operational Condition
-
Compressed Gas Cylinders Properly Stored
-
Gauges / Regulators in Working Order
-
Fire Extinguisher at all Welding/Cutting Locations
CONCLUSION
-
SUMMARY & RECOMMENDATIONS
-
PHOTOS
-