Personnel
-
All personnel on pad wearing proper PPE IAW current PPE Hazard Assessment and/or SDS.
-
SSE's are identified and assigned a mentor. Ref. RP54 6.1.7
-
Personnel H2S awareness trained. Ref. API RP 49 5.1
-
Each company on pad has JSA for their job. Ref. RP54 6.1.7
-
SIMOPS is being coordinated through Co/Man. Ref. RP54 6.1.7
-
Personnel using spotters when backing.
-
Personnel using tag lines. Ref. 1910.180(h)3()(vi), RP54 6.2.12
-
Crews communicating well.
-
All personnel sign in and out when entering/exiting pad. Ref. 1910.38(c)(4)
-
Personnel use designated smoking area. Rf. RP54 7.1.2-3
-
All personnel operating equipment are trained and certified on that equipment. Ref. manufacturer recommendation
-
General housekeeping good. Ref. RP54 6.5.1, 1910.22(a)(1)
-
Comments:
-
Add media
Pad Site
-
is cellar free of water?
-
is reserve pit empty/Covered?
-
Are cellar covers in good condition?
-
Is overall pad in good condition?
-
Is pad free of any previous equipment?
-
All equipment under containment if required by lease?
-
wellhead cages or barriers required?
-
Add media
-
Comments:
Lease Entrance
-
Lease gate and cattle guard free of damage?
-
Proper Signage and sign in sheet at entrance to pad? Ref. API RP54 5.2-5.4, I.S., API RP49, RP54 4.1 a
-
Medical services, driving directions, and first aid kit posted? Ref. 1910.151 (b), RP54 4.1-4.3
-
Comments:
-
Add media
Well Head
-
No leaks around hydraulic lines for BOP or hydraulic valve. Ref. manufacturer recommendation
-
All valves have handles installed
-
Frac stack has platform installed or man lift on location. Ref. RP54 5.5.1
-
All flanges have all bolts and not short bolted. Ref. RP54 6.4.10
-
Cellar has been cleaned out filled in to CSG valve less than 4 ft. And properly guarded. Ref. API 54 7.1.9, API RP 54 6.7.2
-
Flow back tie in.
-
Hydraulic valves have 1 male and 1 female fitting.
-
BOP hoses have crush proof sheaths. Ref. RP53 12.5.2
-
Frac head, hydraulic valve, BOP, and B section should be accompanied with test chart. Ref. RP 53 17.3.7
-
Comments
-
Add media
Closing Unit
-
Closing unit is free of leaks.
-
Connections have 1 male end & 1 female end.
-
Open/Close clearly marked on handle. Ref. RP54 7.2.2, RP53 12.5.3f
-
Closing unit 50 ft. Min. From well head. RP54 7.2.2
-
Valve hand has direct line of sight to well head.
-
Closing unit has crush resistant over hoses. Ref. RP53 12.5.2
-
Valve hand waits for signal before operating handle.
-
Comments:
-
Add media
Post Job
-
Spills cleaned up before leaving location.
-
Location left clean?
-
Cellars empty.
-
Reserve pit empty.
-
Cellar covers in good condition.
-
Does wellhead have cages or guards
-
Area policed, garbage picked up.
-
Add media
-
Comments:
Sign off
-
Signature
-
On site representative