Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

HOME READY FOR QI

  • Was home ready for QI <br>Clean, point up done. Power and water on. Start ups complete.

  • Sign off all items complete

COMMUNITY APPEARANCE

  • Was overall appearance up to Lennar standards? <br>Marketing?<br>Clean streets?

  • Attach photo. Front, sides and rear

EXTERIOR ITEMS (FRONT - SIDES - REAR)

  • Water meter level, no defects<br>

  • Address numbers installed straight

  • Concrete driveway, clean and no defects

  • Concrete control joints installed<br>

  • Lead walk installed, clean , no defects

  • Gutters installed with no defects

  • Pavers clean and free of paint, grease, cracks, rust

  • Pavers installed tight, level, and aesthetically correct at transitions

  • Shutters installed<br>

  • Yard graded correctly - positive drainage from home and swales, no signs of erosion issues

  • Seed/Sod installed - yard free of debris

  • Cleanouts exposed

  • A/C pad level and free of defects

  • A/C lines sealed

  • Condensation line exposed

  • Vents installed and sealed

  • Roof shingles clean, no defects

  • All visible flashing painted

  • Chimney/Direct vent installed

  • Stoop and porches installed, clean no defects<br>

  • Patio/Step pad clean no defects, textured and painted?

  • Stucco applied, no defects

  • Soffit level no defects

  • Window frames free of paint or damages, no defects

  • Screens installed, free of defects

  • Gas lines installed

  • Pediments flashed and caulked

  • Gable vents free of defects

  • Columns painted, free of defects

  • Exterior trim caulked, all painting complete, no defects, all nails and screws puttied

  • All exposed nails removed

  • Exterior entry light installed and operational, no defects

  • Concrete porch slab free of chips and voids

  • Concrete porch slab surface textured and painted

  • Exterior entry light installed and operational, no defects

  • Doorbell operational

  • Entry door handle and deadbolt latch proper function, clean and adjusted

  • Entry door operational , no defects

  • Weather-strip/door sweep correct length, tight, clean,

  • Toe kick installed, painted, no defects

  • Threshold clean, no defects

BRICK/STONE

  • Exterior entry light installed and operational, no defects

  • Veneer clean, no excess mortar

  • Weep holes open

  • Lintels, angle iron primed, painted, no bleed through

  • Step flashing installed and sealed

  • All caulking clean bead, painted and in place

REAR PATIO AREA

  • Concrete patio slab free of chips or voids?

  • Concrete patio slab surface textured and painted?

  • Patio ceiling caulked at stucco wall edges and corners

  • Exterior entry light installed and operational, no defects

SCREEN ROOM

  • Screening complete, no tears

  • All caulking clean bead, painted and in place

  • Screen door operable, with safety latch

  • Screen porch sealed to house

  • Exterior entry light installed and operational, no defects

DECK AREA

  • Deck boards installed and cleaned, no stamps or tags

  • No chips or voids in the handrails

  • All pickets straight

  • All pickets free of defects

  • Handrails routed for smooth edge

  • All nails/screws properly set

  • Exterior entry light installed and operational, no defects

GARAGE

  • Drywall and paint touch up completed

  • Electric panel and breakers labeled

  • Water heater vented

  • Water heater installed, platform clean/working

  • Overhead door installed and operational

  • Opener installed & plugged in or pre-wire trim

  • Garage door keys / remotes

  • Floor clean, pressure washed/ no defects

  • Control joints installed in slab

  • Window frames and glass clean, screens installed with no defects or tears

  • Window locks operable, no defects

  • Man door assembly installed and functional

  • Fire door to home installed and functional

  • Weather-strip/door sweep correct length, tight, clean,

  • Door knob clean, no defects

  • Garage door w/ glass clean, no defects

FOYER

  • Man door assembly installed and functional

  • Drywall and paint touch up completed

  • Sidelight buttons installed

  • Entry floor clean, complete, no defects, walls squared

  • Entry light installed, clean, operable, no defects

  • Window frames and glass clean, screens installed with no defects or tears

  • Window locks operable, no defects

  • Entry closet completed, door operable, stop installed, no defects

  • Interior trim complete , no defects

  • Check for floor squeaks

  • Switch plate straight

DINING ROOM - LIVING ROOM - STUDY

  • Hvac register straight and operable

  • Drywall and paint touch up completed

  • Floors clean, no defects, splits, chips, scratches

  • Switch plates / outlets straight, no defects or gaps

  • Hvac register level, clear of debris, operable

  • Window frames and glass clean, screens installed with no defects or tears

  • Windows locks operable, no defects

  • Interior trim no defects, walls square

  • Door handles installed, clean, no defects

  • Light fixtures installed, operable, clean, no defects

  • Shoe molding installed, no defects

  • Fireplace clean and functional

KITCHEN / NOOK

  • Drywall and paint touch up completed

  • Floors clean, no defects, splits, chips, scratches

  • Tile / Vinyl - clean, seams sealed or grouted, no defects, walls square

  • Baseboards / casing secure, no defects, walls square

  • Light fixtures installed, operable, clean, no defects

  • Switch plates / outlets straight, no defects or gaps

  • Island receptacles installed

  • Window frames and glass clean, screens installed with no defects or tears

  • Windows and locks operable, no defects

  • Door handles installed, clean, no defects

  • Check for floor squeaks

  • Countertops secured to wall, caulked, no defects

  • Island countertop installed, puttied, no defects

  • Cabinets trimmed, no defects, operable, shelves installed, supported, door bumpers installed

  • Cabinets clean

  • Toe kicks and shoe molding installed, puttied, no defects

  • Appliances installed, cleaned, set up, hooked up, operable, no scratches, dents or defects<br>Attach photo of model and serial numbers

  • Anti-tip device installed

  • Sink clean, no dents, no defects

  • Sink faucet operable, Hot and Cold correctly set up

  • Disposal installed and separate switch, operable, no defects

  • GFCI installed

  • Light fixtures installed, operable, clean, no defects

  • Backdoor handle set installed, clean, no defects, buttons installed in glass, door painted

  • Backdoor weatherstrip installed, clean, no defects

  • Backdoor toe, kick installed, painted, no defects

  • Pantry clean complete free of defects

  • Hvac register level and operable

  • Paint touch up kit

  • Warranty booklets in drawer

Powder bath

  • Baseboard/casing completed no defects

  • Drywall and paint touch up complete<br>

  • Door knobs clean,no defects

  • Door stops installed

  • Window frames and glass clean, screens installed with no defects or tears

  • Window locks operable, no defects

  • Pedestal sink clean no defects

  • Bath accessories installed,level and secured, no defects

  • Mirror clean level no scratches

  • All scussion plates installed

  • Light and exhaust fan installed and operable

  • Toilets flush no defects

  • Floors clean and no defects

  • Vanity faucet operable no leaks and secure

BATHROOM

  • Location

  • Drywall and paint touch up completed

  • Interior trim completed, no defects

  • Door knobs clean, no defects

  • Door stops installed

  • Cabinets trimmed, do defects, operable, shelves installed, supported, door bumpers installed

  • Window frames and glass clean, screens installed with no defects or tears

  • Window locks operable, no defects

  • Vanity faucet operable, no defect or leaks

  • Mirror clean, level, no scratches or defects

  • All scussion plates installed

  • Shower installed, no defects

  • Shower enclosure square, Shower door, operable, no leaks, no defects

  • Tub/Shower complete, buffed, no defects or chips

  • Tub/Shower drains are clear and operable

  • Tub overflow operable

  • Toilet flushes, no defects, operable, shut off operable

  • Light fixtures/Exhaust fan operable, no defects

HALLWAY MAIN FLOOR

  • Smoke detectors/co2 operational

  • Drywall and paint touch up completed

  • Interior trim completed, no defects

  • Door stops installed

  • Interior doors clean, no defects, operable

  • Door knobs clean, no defects

  • Window frames and glass clean, screens installed with no defects or tears

  • Window locks operable, no defects

  • Closet door operable

  • Closet interior complete

  • Closet shelving, installed, level, no defects

  • Carpet cleaned, vacuumed

  • Carpet seams tight

  • Carpet tacked down in all areas

  • Switches and outlet plate straight

  • Hvac vents straight, no defects

  • Thermostat installed, clean, level, no defects

  • Check for floor squeaks

  • Light fixtures installed, operable, no defects

STAIRS

  • Drywall and paint touch up completed

  • Pickets installed at handrails, no stringer defects, no exposed nails

  • Check for floor squeaks

  • Handrails installed, puttied, returns installed at stringer, correct color hardware?

  • Window frames and glass clean, screens installed with no defects or tears

  • Window locks operable, no defects

  • Knee wall secure

2ND FlOOR HALLWAY

  • Drywall and paint touch up completed

  • Smoke detector/co2 operational

  • Window frames and glass clean, screens installed with no defects or tears

  • Smoke detector/co2 operational

  • Check for floor squeaks

MASTER BEDROOM

  • Smoke detectors operational

  • Drywall and paint touch up completed

  • Interior trim completed, no defects

  • Door stops installed

  • Interior doors clean, no defects, operable

  • Door knobs clean, no defects

  • Window frames and glass clean, screens installed with no defects or tears

  • Window locks operable, no defects

  • Closet door operable

  • Closet interior complete

  • Closet shelving, installed, level, no defects

  • Carpet cleaned, vacuumed

  • Carpet seams tight

  • Carpet tacked down in all areas

  • Switches and outlet plate straight

  • Hvac vents straight, no defects

  • Return air filters installed

  • Check for floor squeaks

  • Light fixtures installed, operable, no defects

BATHROOM-MASTER

  • Drywall and paint touch up completed

  • Floor clean, no defects, splits, chips, scratches

  • Interior trim completed, no defects

  • Door knobs clean, no defects

  • Door stops installed

  • Cabinets trimmed, do defects, operable, shelves installed, supported, door bumpers installed

  • Window frames and glass clean, screens installed with no defects or tears

  • Window locks operable, no defects

  • Vanity faucet operable, no defect or leaks

  • Mirror clean, level, no scratches or defects

  • All scussion plates installed

  • Surrounds installed, no defects

  • Shower enclosure square, Shower door, operable, no leaks, no defects

  • Tub/Shower complete, buffed, no defects or chips

  • Tub/Shower drains are clear and operable

  • Tub overflow operable

  • Toilet flushes, no defects, operable, shut off operable

  • Light fixtures/Exhaust fan operable, no defects

  • GFCI outlet labeled

  • Hvac register level and operable

UTILITY/LAUNDRY ROOM

  • Drywall and paint t/u completed

  • Interior trim installed / painted

  • Doors operable, no defects, paint all sides

  • Door stop installed

  • Washer drain box installed correctly

  • Flooring clean, no defects, seam sealed/grouted, walls square

  • Shelving installed and level

  • Clean out cover installed

  • Light fixture installed, operable

  • Hvac register straight, clear of debris, no defects

  • Dryer vent installed

BONUS

  • Description of the location of this room.

  • Smoke detectors operational

  • Drywall and paint touch up completed

  • Interior trim completed, no defects

  • Door stops installed

  • Interior doors clean, no defects, operable

  • Door knobs clean, no defects

  • Window frames and glass clean, screens installed with no defects or tears

  • Window locks operable, no defects

  • Closet door operable

  • Closet interior complete

  • Closet shelving, installed, level, no defects

  • Carpet cleaned, vacuumed

  • Carpet seams tight

  • Carpet tacked down in all areas

  • Switches and outlet plate straight

  • Hvac vents straight, no defects

  • Return air filters installed

  • Check for floor squeaks

  • Light fixtures installed, operable, no defects

SECONDARY BEDROOMS

  • Description of the location of this room.

  • Smoke detectors operational

  • Drywall and paint touch up completed

  • Interior trim completed, no defects

  • Door stops installed

  • Interior doors clean, no defects, operable

  • Door knobs clean, no defects

  • Window frames and glass clean, screens installed with no defects or tears

  • Window locks operable, no defects

  • Closet door operable

  • Closet interior complete

  • Closet shelving, installed, level, no defects

  • Carpet cleaned, vacuumed

  • Carpet seams tight

  • Carpet tacked down in all areas

  • Switches and outlet plate straight

  • Hvac vents straight, no defects

  • Check for floor squeaks

  • Light fixtures installed, operable, no defects

SECONDARY BEDROOMS

  • Description of the location of this room.

  • Smoke detectors operational

  • Drywall and paint touch up completed

  • Interior trim completed, no defects

  • Door stops installed

  • Interior doors clean, no defects, operable

  • Door knobs clean, no defects

  • Window frames and glass clean, screens installed with no defects or tears

  • Window locks operable, no defects

  • Closet door operable

  • Closet interior complete

  • Closet shelving, installed, level, no defects

  • Carpet cleaned, vacuumed

  • Carpet seams tight

  • Carpet tacked down in all areas

  • Switches and outlet plate straight

  • Hvac vents straight, no defects

  • Check for floor squeaks

  • Light fixtures installed, operable, no defects

SECONDARY BEDROOMS

  • Description of the location of this room.

  • Smoke detectors operational

  • Drywall and paint touch up completed

  • Interior trim completed, no defects

  • Door stops installed

  • Interior doors clean, no defects, operable

  • Door knobs clean, no defects

  • Window frames and glass clean, screens installed with no defects or tears

  • Window locks operable, no defects

  • Closet door operable

  • Closet interior complete

  • Closet shelving, installed, level, no defects

  • Carpet cleaned, vacuumed

  • Carpet seams tight

  • Carpet tacked down in all areas

  • Switches and outlet plate straight

  • A/C vents straight, no defects

  • Check for floor squeaks

  • Light fixtures installed, operable, no defects

SECONDARY BEDROOMS

  • Description of the location of this room.

  • Smoke detectors operational

  • Drywall and paint touch up completed

  • Baseboards/casing completed, no defects

  • Door stops installed

  • Interior doors clean, no defects, operable

  • Door knobs clean, no defects

  • Window frames and glass clean, screens installed with no defects or tears

  • Window locks operable, no defects

  • Closet door operable

  • Closet shelving, installed, level, no defects

  • Closet interior complete

  • Carpet cleaned, vacuumed

  • Carpet seams tight

  • Carpet tacked down in all areas

  • Switches and outlet plate straight

  • A/C vents straight, no defects

  • Check for floor squeaks

  • Light fixtures installed, operable, no defects

BATHROOMS

  • Location

  • Drywall and paint touch up completed

  • Floor clean, no defects, splits, chips, scratches

  • Baseboard/casing completed, no defects

  • Door knobs clean, no defects

  • Door stops installed

  • Cabinets trimmed, do defects, operable, shelves installed, supported, door bumpers installed

  • Window frames and glass clean, screens installed with no defects or tears

  • Window locks operable, no defects

  • Vanity faucet operable, no defect or leaks

  • Mirror clean, level, no scratches or defects

  • All scussion plates installed

  • Surrounds installed, no defects

  • Shower enclosure square, Shower door, operable, no leaks, no defects

  • Tub/Shower complete, buffed, no defects or chips

  • Tub/Shower drains are clear and operable

  • Tub overflow operable

  • Toilet flushes, no defects, operable, shut off operable

  • Light fixtures/Exhaust fan operable, no defects

  • GFCI outlet labeled

  • Check switches for correct order

  • Hvac register level/flush and operable

ATTIC / STORAGE ROOM

  • Clean/no debri

  • Insulation free from disturbance. Attach photo

  • Free of any defects. Protruding nails in walkable space

MISC.

  • Mechanical rm clean

  • Verify Hvac working

  • Air filter installed and free of debri/construction dust

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.