Information
-
Operative Name
-
Job Number
-
Contract
-
Reason for Audit
-
Audit Type
-
Location
-
Conducted on
-
Prepared by
Electrical
-
Preliminary electrical checks carried out correctly.
-
Appliance/s have the correctly rated fuse.
-
RCD utilised with portable electrical tools.
-
Correct equipotential bonding and pisitioning (Gas meter).
-
Satisfactory distance from electrical wire/cables and gas pipework.
Gas meter, ECV, and gas installation
-
Meter installation satisfactory.
-
Correct labels fitted.
-
Satisfactory gas pipework installation and sleeving.
Testing
-
Satisfactory tightness test.
-
Satisfactory meter regulator working pressure.
-
Satisfactory appliance inlet pressure.
Operational Checks And Inspections
-
Flue route, integrity and termination.
-
Flue flow and spillage test.
-
Burner and injector.
-
Compartment ventilation (and labels).
-
Combustion air/ventilation and route.
-
CO/CO Ratio
-
Burner operating pressure.
-
Gas rate.
-
Clean/clear/undamaged heat exchanger
-
Operation of safety device.
-
Case seal (Room sealed appliances)
-
Return airpath and plenum (warm air unit)
-
Catchment space and dampers (gas fires)
-
Water flow rates and temperature set
-
System flushed and inhibitor added.
-
Compliant with manufacturer's instructions.
Replacement and installation. Satisfactory installation/operation of
-
Radiators and TVRs.
-
Condense pipe, inc pump.
-
Pressure relief pipe and route.
-
Making good and building work.
-
Cylinders, controls, tanks and filling loops.
-
Flues in voids inspection, flue sealing and route.
-
CO/Smoke alarms checked.
-
Pipework and installation lagging.
Documentation
-
Company installation documentation pack completed.
-
Warning notices correctly issued and applied.
-
Benchmark book completed correctly and issued.
-
Landlord gas safety record completed correctly and issued.
-
Cookers details recorded on landlords gas safety record.
Health and Safety
-
Engineer has up to date Health & Safety folder.
-
Engineer had an up to date copy of the company asbestos policy.
-
Safe working practices applied.
-
Compliant and safe waste disposal method.
-
Engineer qualified for work carried out.
-
Engineer wearing issued uniform.
-
Identification badge visable
-
Safety footwear being worn.
-
Required PPE being worn.
-
PPE in good condition.
-
PPE available in the van-gloves mask etc..
-
First aid kit available and stocked.
-
Fire extinguisher available and in date.
Customer satisfaction
-
Engineer possess and uses gas safe ID card.
-
Clean, tidy and protected working area/s.
-
Customer satisfied with work quality.
-
Appointed times agreed and met.
-
Engineers appearance reflects quality.
Safe completion
-
Has the appliance/installation been left safe for use.
General comments/observations- Actions to be taken.
Inspection carried out by
-
Add signature
-
Select date
Operative comments
-
This is a true reflection of my work.
-
I agree to abide by the actions mentioned above.
Operative
-
Add signature
-
Select date