Information
-
Store ID and Name
-
Client
-
Conducted on
-
Engineer Name
-
Location
General Information
-
Engineers are to send a version of the stores report after the end of each working day, regardless of completion levels. Please send all reports to (Support) at the end of each nights work.
-
Engineers are to sign in using the store sign-in book located with the manager. Please check this box to continue after doing so.
Till Install (First night)
Till Change-out
-
Photo of the Back Office screen showing the Old Till information.
-
Photo of the Back Office screen showing the New Till information when completed.
-
Photo's of the till installations
Till
-
Photo of the pole screws, with the safety caps on.
-
Have the lock screens been enabled correctly?
-
Photo of the entire till set up, showing all the tills.
Kit Decommision
-
Photo of all the old scales lined up, showing the scale display for each one.
-
Photo showing all the Beetles stacked, from the rear.
-
Photo of all the equipment boxed securely using bubble wrap.
Counter Swapout (Second Night)
Counter Swapout
-
Photo's of the counter swapout
Counter
-
Photo of the Beetle housing cabling, with the cabling made tidy.
-
Photo of the U-Grommet in place on the PED Pole
-
Photo of the Beetle on the floor showing the cabling velcroed tidy, as shown in the manual
-
Photo of the scale cabling made tidy
-
Photo of till showing the front from the Cashier view - All till must be in the picture.
-
Photo of till showing the back from the Customer view - All till must be in the picture.
-
Photo of all the tills and counters from distance after swapout is completed.
Sign Off
-
Engineers Comments (To include any delays, issues or incidents)
-
By signing below I hereby acknowledge that all works have been completed to the best of my ability. Any damage caused has been rectified where possible or noted in the relevant section.
-
Engineer Signature
-
By signing below I hereby confirm that all works have been completed to a satisfactory standard.
-
Site Contact Signature
-
Engineer Arrival Time
-
Engineer Departure Time