Information
-
Store No:
-
Store Name
-
Installation Date
-
Location
Lidl Installation Sign-Off
Details
-
Lead Engineer Name:
-
Installation Start Date:
Site Pre-Installation Works
-
Photo of Attock Cabinet before Works
-
Ping Test Results from Vista before Works - Call 02920990533
-
Photo of Time and attendance Machine before Works
-
Number of Tills
-
Number of SCO's
-
Number of Access Points
-
Does the site currently have Customer WiFi?
-
Is ACD Showing 4-Back Office Forms
-
Is ACD Printer showing Firmware 12.6
-
Update ACD Printer to Firmware 12.6
-
Till, SCO, Back office PC, Customer Wifi, MAT issues prior to works :
Pre-Installation Access Points
-
Cisco Access points Prior to Installation AP1 - Managers Office
-
Cisco Access points Prior to Installation AP2 - Canteen
-
Cisco Access points Prior to Installation AP3 - Store Front
-
Cisco Access points Prior to Installation AP4 - Store Middle
-
Cisco Access points Prior to Installation AP5 - Store Back
-
Cisco Access points Prior to Installation AP6 - Warehouse Front
-
Cisco Access points Prior to Installation AP7 - Warehouse Back
-
Any aditional Access Points?
Installation Works
-
Huawei access point after installation AP1 - Managers Office
-
Huawei access point after installation AP2 - Canteen
-
Huawei access point after installation AP3 - Store Front
-
Huawei access point after installation AP4 - Store Middle
-
Huawei access point after installation AP5 - Store Back
-
Huawei access point after installation AP6 - Warehouse Front
-
Huawei access point after installation AP7 - Warehouse Back
-
Any aditional Access Points?
-
Attock cabinet after works complete
Interlinks
-
Can Attock Interlinks be utilised for patching?
-
Install 5m Red Patch Leads between the Switches as a temporary solution.
Post Works Checks
-
Ping test results from Vista after switch move
-
MAT Terminal Connected
-
XWEB Connected and showing link light (attach images)
-
Safe Alarm connected and showing link light is (attach images)
-
Time and Attendance Showing Store Number
-
ACD Connected - Showing 4-BO Forms
-
Till Receipts after manager Till Checks if available
-
Any remaining issues that require investigation or elements that could not be completed?
Installation Sign-Off
Installation Sign-Off:
-
Store Contact (CAPITALS):
-
Lead Engineer (CAPITALS):
-
Installation Finish Date:
-
LMF