Title Page
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
SIGNING IN
-
Have all trades signed the Store Visitors Book?
-
Does everyone attending site have a valid CSCS Card? If no please provide details.
-
Take Photograph
PRE CHECK AT START OF SHIFT
-
Did all trades arrive before start time? If no please state company and arrival time.
-
Did transport arrive before start time? If no please state arrival time.
-
Have all materials and fixings been checked and any shortages reported to out of hours contact
-
Is the checkout area clear of all store equipment and checkouts demerchandised before work commences
-
Were all belts on checkouts checked before works commenced. Please note any that were not.
INSTALLATION CHECKLIST
-
Has all checkout Skirting been painted
-
Take Photograph
-
Have all bump rail and end caps been correctly fitted?<br>
-
Take Photograph
-
Has all vinyl flooring, cash boxes and inner panels been correctly fitted to hopper?<br>
-
Take Photograph
-
Have all cladding panels been fitted to the checkout correctly?<br>
-
Take Photograph
-
Have all carriage computer doors, hopper entry doors been fitted correctly?<br>
-
Take Photograph
-
Have all merchandising boxes been correctly positioned?<br>
-
Take Photograph
-
Has all stainless trims been cleaned and re-fitted?<br>
-
Take Photograph
POST INSTALLATION CHECKLIST (BEFORE SIGNING OFF ANY TRADES)
-
Are all Main Bank Checkouts operational?
-
Has all redundant equipment, rubbish and materials been removed from the shop floor and a final clean been completed before the installation team leave?
-
Have all trades “Signed Out” of the Store Visitors Book?
-
Take Photograph with all times visible
INSTALLATION SUMMARY
-
Were out of hours support contacted during the shift? If Yes please provide details.
-
Were there any issues that delayed the installation? If Yes please provide details.
-
Any other comments :-
Signatures
-
Site Manager Signature
-
Lidl Duty Manager Signature
-