Information
-
Main Contractor
-
Site / Location
-
Conducted on
-
Prepared by
-
Document No.
-
Personnel on site
-
Completed
-
Score
GENERAL HEALTH AND SAFETY
-
First Impression and general housekeeping
-
Visitors are proactively advised of the risks and asked to sign on to the Hazard ID / Risk Control Plan
-
Workplace Safety Rules are being followed on site (eg Life Saving Rules / Cardinal Rules etc)
-
Site Hazard ID / Risk Control Plans completed and all Risk controls in place
-
All staff and visitors signed on to the Hazard ID / Risk Control Plan including subcontactors
-
TMP set up correctly and effectively controlling traffic with safe routes for pedestrians and cyclists
-
Plant and Equipment Prestarts completed with good history
-
Operators are skilled and competent to operate the plant and equipment
-
Seatbelts are used on all plant where fitted
-
Operations are 4m clear of overhead lines at all times
-
Relevant SWMS / JSA's for the high-risk tasks on site
-
Correct PPE for the task worn by everyone and in good condition
-
Sanitary Facilities available including water and sun protection
-
Electrical Equipment protected from damage, tagged and within test. RCDs in use
-
Manual Handling risks identified and managed
-
Lifting equipment tagged and within test
WORK AREAS
-
High risk or Notifiable Work is managed. eg Confined Space entry, Working at height, lifting etc
-
Permits in place where required eg close approach near power or gas
-
Falls from unprotected edges, excavations and holes managed
-
Dial B4 you dig completed when penetrating deeper than 300mm and all services marked out
-
Shoring (trench shields) in place when deeper than 1.5m and / or suitable batter or bench
-
Material storage including stockpiles well managed and positioned safely
-
Pedestrians, cyclists and motorists are protected after work hours
ENVIRONMENTAL - HSNO
-
Adequate Environmental Management Plan on site and resource consent conditions are understood and complied with
-
Waterways are protected. Sediment, run off control and measures are adequate and effective
-
Heritage, Archaeology and Cultural aspects are understood and managed
-
Fuels, Chemicals and Contaminates are stored safely
-
Spill kits appropriate type and size for the volume of products on site
-
Waste and Energy minimization measures are being followed eg Plant not left idling
EMERGENCY MANAGEMENT, SIGNAGE AND COMMUNICATIONS
-
Communication equipment, RT, Cellphone, EPERB
-
Exits, Entry and Assembly Points clearly marked and clear of hazards
-
Fire Extinguishers in place and within test
-
First Aid Kits in place and well stocked
-
Emergency Response Procedures' noted on Hazard ID / Prestart and understood
COMMENTS AND RECOMMENDATIOS
-
Enter corrective actions that will be undertaken
SIGN OFF
-
Auditor
-
Site Supervisor