Stage No 10: Assembly of central mandrel, lever shield & vertical axle sub assembly with measuring unit housing

Stage 10: Assembly of central mandrel, lever shield & vertical axle sub assembly with measuring unit housing

  • Equipment at the station:(a) vertical axle assembly SPM,(b) Air Gun,There is no other equipment at the workstation

  • Operator must wear Apron and Cap.

  • DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.

  • Work station must be free from dust, unused material and tools.

  • Work station light must be switched on and working.

  • Operator must follow the check do check process.

  • Positive Control Sheet must be available and fill by operator

  • TPM sheet must be fill by operator and maintenance Team

  • All material must be identify and placed at defined location.

  • Waste parts should not be spread over in the shop floor & working table.

  • Emergency switch must be in working condition.

  • Red bin must be available for rejection material at stage.

  • Operator must follow single piece flow process.

  • Operator must be skilled.

  • Operator ID

Stage 10: Greasing of Vertical axles and assemble Vertical axle sealant rings with vertical axles.

Stage 10: Greasing of Vertical axles and assemble Vertical axle sealant rings with vertical axles.

  • Equipment at the station:(a) Straightness checking Gauge ( R-9354.1),(b) Brush,(c) Grease,There is no other equipment at the workstation

  • Operator must wear Apron & Cap.and gloves

  • DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.

  • Positive control sheet must be displayed and check sheet must be fill by operator.

  • Straightness checking Gauge must be calibrated.

  • Work station must be free from dust, unused material and tools.

  • Work station light must be switched on and working.

  • Operator must follow the check do check process.

  • Grease must be free from dust contamination.

  • All material must be identify and placed at defined location.

  • Waste parts should not be spread over in the shop floor & working table.

  • Red bin must be available for rejection material at stage.

  • Operator must follow single piece flow process.

  • Operator must be skilled.

  • Operator ID

Stage 20: Greasing of both holder arm with diaphragm assembly on housing

Stage 20: Greasing of both holder arm with diaphragm assembly on housing

  • Equipment at the station:(a) Fixture for Diaphragm subassembly with MU housing,(b) Air Gun,(c) Diaphragm stand,(d)Brush,There is no other equipment at the workstation

  • Operator must wear Apron & Cap.

  • DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.

  • Work station must be free from dust, unused material and tools.

  • Operator must follow the check do check process.

  • Grease must be free from dust contamination.

  • All material must be identify and placed at defined location.

  • Waste parts should not be spread over in the shop floor & working table.

  • Red bin must be available for rejection material at stage.

  • Number of assemblies waiting

  • Operator must follow single piece flow process.

  • Operator must be skilled.

  • Operator ID

Stage 20A : Assembly diaphragm 1.2 and diaphragm molded shield with diaphragm shield driving

Stage 20A: Assembly diaphragm 1.2 and diaphragm moulded shield with diaphragm shield driving

  • Equipment at the station:(a) Ultra Sonic Welding Machine,(b) Air Gun,There is no other equipment at the workstation.

  • Operator must wear Apron, Earplug & Cap.

  • DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.

  • Positive control must be done by operator.

  • All pressure Gauge Indicator must be calibrated.

  • TPM Sheet must be done by operator and maintenance team.

  • Work station must be free from dust, unused material and tools.

  • Operator must follow the check do check process.

  • All material must be identify and placed at defined location.

  • Waste parts should not be spread over in the shop floor & working table.

  • Emergency switch must be in working condition.

  • Red bin must be available for rejection material at stage.

  • Operator must follow single piece flow process.

  • Operator must be skilled.

  • Operator ID

Stage 30: Back Diaphragm assembly and bar code label on housing assembly.

Stage 30: Back Diaphragm assembly and bar code label on housing assembly.

  • Equipment at the station:(a) Fixture for Diaphragm subassembly with MU housing ,(b) Grease box,(c) Air Gun,(d) Computer,(e) Barcode printer,There is no other equipment at the workstation.

  • Operator must wear Apron and Cap.

  • DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.

  • Work station must be free from dust, unused material and tools.

  • Work station light must be switched on and working.

  • Operator must follow the check do check process.

  • Barcode printing must not be shifted and scattered.

  • All material must be identify and placed at defined location.

  • Waste parts should not be spread over in the shop floor & working table.

  • Red bin must be available for rejection material at stage.

  • Operator must follow single piece flow process.

  • Operator must be skilled.

  • Operator ID

Stage 40: Assemble front & back covers with measuring unit housing sub-assembly.

Stage 40: Assemble front & back covers with measuring unit housing sub-assembly.

  • Equipment at the station:(a) Front & Back cover assembly SPM ,(b) Air Gun ,There is no other equipment at the workstation.

  • Operator must wear Apron and Cap.

  • DMI (Detailed Manufacturing Instruction) must be displayed. and Operator must follow DMI.

  • Work station must be free from dust, unused material and tools.

  • Work station light must be switched on and working.

  • Positive Control must be done by operator.

  • Precontrol must be done by supervisor.

  • Emergency switch and safety curtain must be in working condition.

  • TPM sheet must be fill by operator and maintenance Team

  • Operator must follow the check do check process.

  • All material must be identify and placed at defined location.

  • Waste parts should not be spread over in the shop floor & working table.

  • Red bin must be available for rejection material at stage.

  • Operator must follow single piece flow process.

  • Operator must be skilled.

  • Operator ID

Stage 50: Fitment of Valve base and outlet with housing assembly

Stage 50: Fitment of Valve base and outlet with housing assembly

  • Equipment at the station:(a) Fixture for mu housing assembly with valve base & outlet fixture,(b) cotton cloth box,(c) Conveyor,There is no other equipment at the workstation

  • Operator must wear Apron, Gloves, and Cap.

  • DMI (Detailed Manufacturing Instruction) must be displayed and operator must follow DMI.

  • MU housing assembly with valve base & outlet assembly Fixture must not be worn out.

  • Fixture must be fixed and stable while working.

  • Work station must be free from dust, unused material and tools.

  • Operator must follow the check do check process.

  • Operator must check alignment of dispensed sika on valve base and outlet assembly.

  • All material must be identify and placed at defined location.

  • Waste parts should not be spread over in the shop floor & working table.

  • Red bin must be available for rejection material at stage.

  • Operator must follow single piece flow process.

  • Operator must be skilled.

  • Operator ID

Stage 50A: Applying adhesive sealant (Sikaflex221) on valve base & outlet assembly.

Stage 50A: Applying adhesive sealant (Sikaflex221) on valve base & outlet assembly.

  • Equipment at the station:(a) HMI,(b) Weighing Machine ,(c) Air Gun,There is no other equipment at the workstation

  • Operator must wear Apron, Gloves, and Cap.

  • DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.

  • Positive control must be done by operator.

  • TPM sheet must be fill by operator & Maintenance Team.

  • Work station must be free from dust, unused material and tools.

  • Operator must follow the check do check process.

  • Weighing Machine & all Pressure Gauge Indicator must be calibrated.

  • Weighing machine Alignment in analytical balance must be proper and machine must be stable.

  • Sika Flex shelf life must not be expired.

  • All material must be identify and placed at defined location.

  • Emergency switch must be in working condition.

  • Waste parts should not be spread over in the shop floor & working table.

  • Red bin must be available for rejection material at stage.

  • Operator must follow single piece flow process.

  • Operator must be skilled.

  • Operator ID

Stage 60:Adhesive Sealant Curing

Stage 60:Adhesive Sealant Curing

  • Equipment at the station:(a) Humidifier,(b) Barcode reader,(c) humidifier Sensor,There is no other equipment at the workstation

  • DMI (Detailed Manufacturing Instruction) must be displayed.

  • Work station must be free from dust, unused material and tools.

  • Positive Control must be done by operator.

  • Precontrol must be done by supervisor.

  • Operator must maintain FIFO manner.

  • All equipment must be identify and placed at defined location.

  • Emergency switch must be in working condition.

  • Waste parts should not be spread over in the shop floor & working table.

  • Operator must follow single piece flow process.

  • Operator must be skilled.

  • Operator ID

Stage70:Tightness testing

Stage70:Tightness testing

  • Equipment at the station:(a) Tightness testing Jig, (b) locking jig, There is no other equipment at the workstation

  • Operator must wear Apron and Cap.

  • DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.

  • Positive Control must be done by operator.

  • All pressure Gauge Indicator must be calibrated.

  • TPM sheet must be fill by operator and maintenance Team

  • Tightness testing Jig must be easy to operate.

  • Work station must be free from dust, unused material and tools.

  • Operator must follow the check do check process.

  • All material must be identify and placed at defined location.

  • Waste parts should not be spread over in the shop floor & working table.

  • Red bin must be available for rejection material at stage.

  • Number of assemblies being processed by this stage should be one

  • Emergency switch must be in working condition.

  • Operator must follow single piece flow process.

  • Operator must be skilled.

  • Operator ID

Stage 70A: Transmission gear and holder gear assembly

Stage70A: Transmission gear and holder gear assy

  • Operator must wear Apron and Cap.

  • DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.

  • Work station must be free from dust, unused material and tools.

  • Operator must follow the check do check process.

  • MU Assembly part must be free from fleshes, burr, damage and moulding defect.

  • Angle Gear and transmission Gaer must be rotate smoothly

  • All part must be properly lock.

  • Angle Gear must not be rotate in antilock wise

  • All material must be identify and placed at defined location.

  • Waste parts should not be spread over in the shop floor & working table.

  • Red bin must be available for rejection material at stage.

  • Operator must be skilled.

Stage80: Oscillator lever Assembly

  • Equipment at the station:(a) Oscillatory Lever assembly Fixture (b) Grease, There is no other equipment at the workstation

  • Operator must wear Apron & Cap.

  • DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.

  • Grease must be free from dust contamination.

  • Positive Control must be done by operator.

  • TPM sheet must be fill by operator and maintenance Team

  • Fixture must be fixed and stable while working and must be easy to operate.

  • Pressure Gauge Indicator must be calibrated.

  • Work station must be free from dust, unused material and tools.

  • Work station light must be switched on and working.

  • Operator must follow the check do check process.

  • All material must be identify and placed at defined location.

  • Waste parts should not be spread over in the shop floor & working table.

  • Red bin must be available for rejection material at stage.

  • Operator must follow single piece flow process.

  • Operator must be skilled.

  • Operator ID

Stage90: Pressure Drop.

Stage90: Pressure Drop.

  • Equipment at the station:(a) pressure drop testing machine,(b) Cir clip pliers, There is no other equipment at the workstation

  • Operator must wear Apron & Cap.

  • DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.

  • Positive Control must be done by operator.

  • TPM sheet must be fill by operator and maintenance Team

  • MU pressure transmitter must be calibrated.

  • The limit value on the station to test pressure loss must be at 65 Pa.

  • Test time should be 05 second.

  • Central Gear wheel should rotate 360°

  • Work station must be free from dust, unused material and tools.

  • Work station light must be switched on and working.

  • Operator must follow the check do check process.

  • All material must be identify and placed at defined location.

  • Waste parts should not be spread over in the shop floor & working table.

  • Red bin must be available for rejection material at stage.

  • Operator must follow single piece flow process.

  • Operator must be skilled.

  • Operator ID

Stage100: Positioning Frame 1.2 Assembly

Stage100: Positioning Frame 1.2 Assembly

  • Operator must wear Apron and Cap.

  • DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.

  • Work station must be free from dust, unused material and tools.

  • Operator must follow the check do check process.

  • MU Assembly part must be free from fleshes, burr, damage and moulding defect.

  • Frame must be properly locked.

  • All material must be identify and placed at defined location.

  • Waste parts should not be spread over in the shop floor & working table.

  • Red bin must be available for rejection material at stage.

  • Operator must follow single piece flow process.

  • Operator must be skilled.

  • Operator ID

Stage110: Error Testing

Stage110: Error Testing

  • Equipment at the station:(a) Computer,(b) Barcode Reader, There is no other equipment at the workstation

  • Operator must wear Apron and Cap.

  • DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.

  • Work station must be free from dust, unused material and tools.

  • Work station light must be switched on and working.

  • Operator must follow the check do check process.

  • Positive Control must be done by operator.

  • All temprature , humidity & and pressure indicator must be calibrted

  • Temp. and humidity must be maintain as per testing Requirement.

  • All material must be identify and placed at defined location.

  • Waste parts should not be spread over in the shop floor & working table.

  • Red bin must be available for rejection material at stage.

  • Operator must follow single piece flow process.

  • Operator must be skilled.

  • Operator ID

  • Line supervisor

  • Auditor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.