Title Page
-
Conducted on
-
Prepared by
-
Line Supervisor
-
Shift
Stage No 10: Assembly of central mandrel, lever shield & vertical axle sub assembly with measuring unit housing
Stage 10: Assembly of central mandrel, lever shield & vertical axle sub assembly with measuring unit housing
-
Equipment at the station:(a) vertical axle assembly SPM,(b) Air Gun,There is no other equipment at the workstation
-
Operator must wear Apron and Cap.
-
DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.
-
Work station must be free from dust, unused material and tools.
-
Work station light must be switched on and working.
-
Operator must follow the check do check process.
-
Positive Control Sheet must be available and fill by operator
-
TPM sheet must be fill by operator and maintenance Team
-
All material must be identify and placed at defined location.
-
Waste parts should not be spread over in the shop floor & working table.
-
Emergency switch must be in working condition.
-
Red bin must be available for rejection material at stage.
-
Operator must follow single piece flow process.
-
Operator must be skilled.
-
Operator ID
Stage 10: Greasing of Vertical axles and assemble Vertical axle sealant rings with vertical axles.
Stage 10: Greasing of Vertical axles and assemble Vertical axle sealant rings with vertical axles.
-
Equipment at the station:(a) Straightness checking Gauge ( R-9354.1),(b) Brush,(c) Grease,There is no other equipment at the workstation
-
Operator must wear Apron & Cap.and gloves
-
DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.
-
Positive control sheet must be displayed and check sheet must be fill by operator.
-
Straightness checking Gauge must be calibrated.
-
Work station must be free from dust, unused material and tools.
-
Work station light must be switched on and working.
-
Operator must follow the check do check process.
-
Grease must be free from dust contamination.
-
All material must be identify and placed at defined location.
-
Waste parts should not be spread over in the shop floor & working table.
-
Red bin must be available for rejection material at stage.
-
Operator must follow single piece flow process.
-
Operator must be skilled.
-
Operator ID
Stage 20: Greasing of both holder arm with diaphragm assembly on housing
Stage 20: Greasing of both holder arm with diaphragm assembly on housing
-
Equipment at the station:(a) Fixture for Diaphragm subassembly with MU housing,(b) Air Gun,(c) Diaphragm stand,(d)Brush,There is no other equipment at the workstation
-
Operator must wear Apron & Cap.
-
DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.
-
Work station must be free from dust, unused material and tools.
-
Operator must follow the check do check process.
-
Grease must be free from dust contamination.
-
All material must be identify and placed at defined location.
-
Waste parts should not be spread over in the shop floor & working table.
-
Red bin must be available for rejection material at stage.
-
Number of assemblies waiting
-
Operator must follow single piece flow process.
-
Operator must be skilled.
-
Operator ID
Stage 20A : Assembly diaphragm 1.2 and diaphragm molded shield with diaphragm shield driving
Stage 20A: Assembly diaphragm 1.2 and diaphragm moulded shield with diaphragm shield driving
-
Equipment at the station:(a) Ultra Sonic Welding Machine,(b) Air Gun,There is no other equipment at the workstation.
-
Operator must wear Apron, Earplug & Cap.
-
DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.
-
Positive control must be done by operator.
-
All pressure Gauge Indicator must be calibrated.
-
TPM Sheet must be done by operator and maintenance team.
-
Work station must be free from dust, unused material and tools.
-
Operator must follow the check do check process.
-
All material must be identify and placed at defined location.
-
Waste parts should not be spread over in the shop floor & working table.
-
Emergency switch must be in working condition.
-
Red bin must be available for rejection material at stage.
-
Operator must follow single piece flow process.
-
Operator must be skilled.
-
Operator ID
Stage 30: Back Diaphragm assembly and bar code label on housing assembly.
Stage 30: Back Diaphragm assembly and bar code label on housing assembly.
-
Equipment at the station:(a) Fixture for Diaphragm subassembly with MU housing ,(b) Grease box,(c) Air Gun,(d) Computer,(e) Barcode printer,There is no other equipment at the workstation.
-
Operator must wear Apron and Cap.
-
DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.
-
Work station must be free from dust, unused material and tools.
-
Work station light must be switched on and working.
-
Operator must follow the check do check process.
-
Barcode printing must not be shifted and scattered.
-
All material must be identify and placed at defined location.
-
Waste parts should not be spread over in the shop floor & working table.
-
Red bin must be available for rejection material at stage.
-
Operator must follow single piece flow process.
-
Operator must be skilled.
-
Operator ID
Stage 40: Assemble front & back covers with measuring unit housing sub-assembly.
Stage 40: Assemble front & back covers with measuring unit housing sub-assembly.
-
Equipment at the station:(a) Front & Back cover assembly SPM ,(b) Air Gun ,There is no other equipment at the workstation.
-
Operator must wear Apron and Cap.
-
DMI (Detailed Manufacturing Instruction) must be displayed. and Operator must follow DMI.
-
Work station must be free from dust, unused material and tools.
-
Work station light must be switched on and working.
-
Positive Control must be done by operator.
-
Precontrol must be done by supervisor.
-
Emergency switch and safety curtain must be in working condition.
-
TPM sheet must be fill by operator and maintenance Team
-
Operator must follow the check do check process.
-
All material must be identify and placed at defined location.
-
Waste parts should not be spread over in the shop floor & working table.
-
Red bin must be available for rejection material at stage.
-
Operator must follow single piece flow process.
-
Operator must be skilled.
-
Operator ID
Stage 50: Fitment of Valve base and outlet with housing assembly
Stage 50: Fitment of Valve base and outlet with housing assembly
-
Equipment at the station:(a) Fixture for mu housing assembly with valve base & outlet fixture,(b) cotton cloth box,(c) Conveyor,There is no other equipment at the workstation
-
Operator must wear Apron, Gloves, and Cap.
-
DMI (Detailed Manufacturing Instruction) must be displayed and operator must follow DMI.
-
MU housing assembly with valve base & outlet assembly Fixture must not be worn out.
-
Fixture must be fixed and stable while working.
-
Work station must be free from dust, unused material and tools.
-
Operator must follow the check do check process.
-
Operator must check alignment of dispensed sika on valve base and outlet assembly.
-
All material must be identify and placed at defined location.
-
Waste parts should not be spread over in the shop floor & working table.
-
Red bin must be available for rejection material at stage.
-
Operator must follow single piece flow process.
-
Operator must be skilled.
-
Operator ID
Stage 50A: Applying adhesive sealant (Sikaflex221) on valve base & outlet assembly.
Stage 50A: Applying adhesive sealant (Sikaflex221) on valve base & outlet assembly.
-
Equipment at the station:(a) HMI,(b) Weighing Machine ,(c) Air Gun,There is no other equipment at the workstation
-
Operator must wear Apron, Gloves, and Cap.
-
DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.
-
Positive control must be done by operator.
-
TPM sheet must be fill by operator & Maintenance Team.
-
Work station must be free from dust, unused material and tools.
-
Operator must follow the check do check process.
-
Weighing Machine & all Pressure Gauge Indicator must be calibrated.
-
Weighing machine Alignment in analytical balance must be proper and machine must be stable.
-
Sika Flex shelf life must not be expired.
-
All material must be identify and placed at defined location.
-
Emergency switch must be in working condition.
-
Waste parts should not be spread over in the shop floor & working table.
-
Red bin must be available for rejection material at stage.
-
Operator must follow single piece flow process.
-
Operator must be skilled.
-
Operator ID
Stage 60:Adhesive Sealant Curing
Stage 60:Adhesive Sealant Curing
-
Equipment at the station:(a) Humidifier,(b) Barcode reader,(c) humidifier Sensor,There is no other equipment at the workstation
-
DMI (Detailed Manufacturing Instruction) must be displayed.
-
Work station must be free from dust, unused material and tools.
-
Positive Control must be done by operator.
-
Precontrol must be done by supervisor.
-
Operator must maintain FIFO manner.
-
All equipment must be identify and placed at defined location.
-
Emergency switch must be in working condition.
-
Waste parts should not be spread over in the shop floor & working table.
-
Operator must follow single piece flow process.
-
Operator must be skilled.
-
Operator ID
Stage70:Tightness testing
Stage70:Tightness testing
-
Equipment at the station:(a) Tightness testing Jig, (b) locking jig, There is no other equipment at the workstation
-
Operator must wear Apron and Cap.
-
DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.
-
Positive Control must be done by operator.
-
All pressure Gauge Indicator must be calibrated.
-
TPM sheet must be fill by operator and maintenance Team
-
Tightness testing Jig must be easy to operate.
-
Work station must be free from dust, unused material and tools.
-
Operator must follow the check do check process.
-
All material must be identify and placed at defined location.
-
Waste parts should not be spread over in the shop floor & working table.
-
Red bin must be available for rejection material at stage.
-
Number of assemblies being processed by this stage should be one
-
Emergency switch must be in working condition.
-
Operator must follow single piece flow process.
-
Operator must be skilled.
-
Operator ID
Stage 70A: Transmission gear and holder gear assembly
Stage70A: Transmission gear and holder gear assy
-
Operator must wear Apron and Cap.
-
DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.
-
Work station must be free from dust, unused material and tools.
-
Operator must follow the check do check process.
-
MU Assembly part must be free from fleshes, burr, damage and moulding defect.
-
Angle Gear and transmission Gaer must be rotate smoothly
-
All part must be properly lock.
-
Angle Gear must not be rotate in antilock wise
-
All material must be identify and placed at defined location.
-
Waste parts should not be spread over in the shop floor & working table.
-
Red bin must be available for rejection material at stage.
-
Operator must be skilled.
Stage80: Oscillator lever Assembly
-
Equipment at the station:(a) Oscillatory Lever assembly Fixture (b) Grease, There is no other equipment at the workstation
-
Operator must wear Apron & Cap.
-
DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.
-
Grease must be free from dust contamination.
-
Positive Control must be done by operator.
-
TPM sheet must be fill by operator and maintenance Team
-
Fixture must be fixed and stable while working and must be easy to operate.
-
Pressure Gauge Indicator must be calibrated.
-
Work station must be free from dust, unused material and tools.
-
Work station light must be switched on and working.
-
Operator must follow the check do check process.
-
All material must be identify and placed at defined location.
-
Waste parts should not be spread over in the shop floor & working table.
-
Red bin must be available for rejection material at stage.
-
Operator must follow single piece flow process.
-
Operator must be skilled.
-
Operator ID
Stage90: Pressure Drop.
Stage90: Pressure Drop.
-
Equipment at the station:(a) pressure drop testing machine,(b) Cir clip pliers, There is no other equipment at the workstation
-
Operator must wear Apron & Cap.
-
DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.
-
Positive Control must be done by operator.
-
TPM sheet must be fill by operator and maintenance Team
-
MU pressure transmitter must be calibrated.
-
The limit value on the station to test pressure loss must be at 65 Pa.
-
Test time should be 05 second.
-
Central Gear wheel should rotate 360°
-
Work station must be free from dust, unused material and tools.
-
Work station light must be switched on and working.
-
Operator must follow the check do check process.
-
All material must be identify and placed at defined location.
-
Waste parts should not be spread over in the shop floor & working table.
-
Red bin must be available for rejection material at stage.
-
Operator must follow single piece flow process.
-
Operator must be skilled.
-
Operator ID
Stage100: Positioning Frame 1.2 Assembly
Stage100: Positioning Frame 1.2 Assembly
-
Operator must wear Apron and Cap.
-
DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.
-
Work station must be free from dust, unused material and tools.
-
Operator must follow the check do check process.
-
MU Assembly part must be free from fleshes, burr, damage and moulding defect.
-
Frame must be properly locked.
-
All material must be identify and placed at defined location.
-
Waste parts should not be spread over in the shop floor & working table.
-
Red bin must be available for rejection material at stage.
-
Operator must follow single piece flow process.
-
Operator must be skilled.
-
Operator ID
Stage110: Error Testing
Stage110: Error Testing
-
Equipment at the station:(a) Computer,(b) Barcode Reader, There is no other equipment at the workstation
-
Operator must wear Apron and Cap.
-
DMI (Detailed Manufacturing Instruction) must be displayed and Operator must follow DMI.
-
Work station must be free from dust, unused material and tools.
-
Work station light must be switched on and working.
-
Operator must follow the check do check process.
-
Positive Control must be done by operator.
-
All temprature , humidity & and pressure indicator must be calibrted
-
Temp. and humidity must be maintain as per testing Requirement.
-
All material must be identify and placed at defined location.
-
Waste parts should not be spread over in the shop floor & working table.
-
Red bin must be available for rejection material at stage.
-
Operator must follow single piece flow process.
-
Operator must be skilled.
-
Operator ID
-
Line supervisor
-
Auditor