Title Page
-
Audit Title
-
Client/ Site
-
Select date
-
Asset Number
-
Room number
-
Prepared By
LIOM inspection
-
Fittings and fixtures in good condition
-
Is the overload monitor seperate from the Line Isolation Monitor?
-
Labelling in accordance with AS/NZS 3003<br>(A) associated circuit breaker and its distribution panel<br>(B) unique Identifier e.g. "LIM X"<br>(C) Over current Alarm Set Point
-
Push button PHC test
-
Enter PHC results here
Isolation Transformer inspection
-
Fittings and fixtures in good condition?
-
Isolation labelling<br>(A) Circuit breaker and Distribution panel<br>(B) Unique identifier e.g. "LIM X"<br>(C) Manufacturers label intact
-
Sufficient ventilation
-
Isolation transformer is clean and free from dust build up?
-
Circuit breaker rating and type correct for transformer size?<br>Refer to manufacturers specifications
Load Bank test
-
LIOM overload alarm activates when rated load is applied
-
LIOM overload alarm activates with in 3-5 seconds of the load being applied
-
Enter load bank results here LIM number / Overload current / Alarm time
-
Is the installation compliant with AS/NZS 3003:2011 & AS/NZS 4510:1990?
-
Add signature