Information

  • Document No.

  • Client Company Name

  • Site

  • Contact name

  • Phone number

  • Email address

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Scope of Work

Add drawings and photos

  • Add drawing

  • Add media

Lines

Car parking baylines

  • Number of WHITE baylines

  • Number of YELLOW baylines

  • Js

  • Number of Js

  • Colour

Baylines - other colours

  • Colour

  • Number of OTHER COLOURED baylines

Other lines, edging and taping requirements

  • Hand taping

  • Edging

  • How many metres of edging?

  • Lines

  • Length of line

  • Width of line (standard width is 100mm)

  • Colour

  • Comments

Arrows

  • Arrows

  • Single head straight

  • Number of arrows

  • Colour

  • Single head curved

  • Number of arrows

  • Colour

  • Double head straight

  • Number of arrows

  • Colour

  • Double head curved

  • Number of arrows

  • Colour

  • Describe specific requirements

Stencils and Words

  • Stencils, logos, letters or numbers required (specify WORDS, "numbers", size (mm) etc)

  • Stencils Required

  • Single letters and numbers

  • Hand taped letters and number

  • Colour

Solid Painted Area

  • Is there one or more solid painted areas?

  • Solid painted area
  • Length (metres)

  • Width (metres)

  • Colour

Pedestrian Crossings

  • Is there one or more pedestrian crossing?

  • PedX
  • Length (metres)

  • Width (metres)

  • Colour

  • Describe specific requirements

Hatching

  • Is there one or more areas of hatching?

  • Hatching
  • Heavy, medium or light hatching?

  • Length (metres)

  • Width (metres)

  • Colour

Walkways

  • Walkways required

  • Describe the requirements

Trip Risk Edging

  • Trip risk edging required

  • Describe the requirements

Curb Ends

  • Curb ends required

  • Describe requirements

Stop Bars, Give Way Bars, Continuity Lines

  • Stop bars, give way bars, continuity lines required

  • Stop bar

  • Lineal metres

  • Number of bars

  • Colour

  • Give way bar

  • Lineal metres

  • Number of bars

  • Colour

  • Continuity line

  • Lineal metres

  • Number of lines

  • Colour

Wheel Stops

  • Wheel stops required

  • Number of CONCRETE stops required

  • Number of RECYCLED RUBBER stops required

  • Supply only

  • Painting required

  • Colour

Speed Humps and Bollards

  • Speed humps required?

  • Number of speed humps required

  • Painting required

  • Colour

  • Bollards required

  • Number of bollards required

  • Painting required

  • Colour

Thermoplastic

  • Thermoplastic required

  • Specify requirements

Add Ons

  • Anti-slip

  • Specify requirements

  • Sealant

  • Specify requirements

  • Gun clean

  • Number of cleans required

Scheduling Information

  • Number of crew required

  • How many visits to site will the job require

  • Estimated duration of job (hours)

  • Client's preferred day

  • Clients preferred time of day

  • Specify requirements

  • Notes for scheduler

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.