Information
-
Document No.
-
Line P 5S Checklist and workplace Evaluation
-
Conducted on
-
Prepared by
-
Current Operator
Mezzanine
Sort (Organization): Distinguish between what is needed and not needed
-
Area is clear of unneeded equipment, tools, paperwork ect.
-
Area is clear of unneeded items on floor or Desk
-
Area is clear of material or other items in isles or stairways
-
Area is clear of unneeded material
-
Area is clear of Safety and trip Hazards (water, oil, hoses)
Set in Order (Orderliness): A place for everything and everything in its place
-
Item Locations are labeled correctly
-
Items are in there correct places
-
There are no extra items
-
Aisle ways, workstations, equipment locations are indicated
Shine (Cleanliness): Cleaning, and looking for ways to keep it clean and organized.
-
Floors, walls, stairs and surfaces are free of dirt, oil and pellets
-
Equipment is is kept clean and free of dirt, oil and pellets.
-
Workstations are neat and organized
-
Cleaning materials are easily accessible
-
Lines, labels, signs, etc. are clean and unbroken
-
White boards are in good condition
Standardize (Adherence): Maintain and Monitor the 1st 3 categories
-
Necessary Run information is available
-
All gauges are marked and labeled accurately
-
Storage for all tools and equipment are clearly labeled
-
White boards have all information needed
Audit Review
-
Auditor Signature
-
Operator Signature
Machine
Sort (Organization): Distinguish between what is needed and not needed
-
Area is clear of unneeded equipment, tools, paperwork ect.
-
Area is clear of unneeded items on floor or Desk
-
Area is clear of material or other items in isles or stairways
-
Area is clear of unneeded material
-
Area is clear of Safety and trip Hazards (water, oil, hoses)
Set in Order (Orderliness): A place for everything and everything in its place
-
Item Locations are labeled correctly
-
Items are in there correct places
-
There are no extra items
-
Aisle ways, workstations, equipment locations are indicated
Shine (Cleanliness): Cleaning, and looking for ways to keep it clean and organized.
-
Floors, walls, stairs and surfaces are free of dirt, oil and pellets
-
Equipment is is kept clean and free of dirt, oil and pellets.
-
Workstations are neat and organized
-
Cleaning materials are easily accessible
-
Lines, labels, signs, etc. are clean and unbroken
-
White boards are in good condition
Standardize (Adherence): Maintain and Monitor the 1st 3 categories
-
Necessary Run information is available
-
All gauges are marked and labeled accurately
-
Storage for all tools and equipment are clearly labeled
-
White boards have all information needed
Audit Review
-
Auditor Signature
-
Operator Signature
Additional Items
Additional follow-up items.
-
Is vacuum cleaner present and in proper storage area?
-
Dust and pellet cart is in place and empty
-
Recycle and OSM in the proper place and labeled.
-
Is Shadow board complete with all cleaning utensils?
-
Use this are to identify additional items that need to be corrected or addressed.
Follow-Up
-
Type of Follow-Up
-
Give Description of the item
-
If necessary include photo of item.
-
Who is Responsible for item
-
Was Responsible party notified?
Audit Review
-
Auditor Signature
-
Operator Signature
Preventative Maintenance
Preventative Maintenance
-
Boots for feeder are in place and clamped top and bottom
-
Check hoses at Autoweigh for damage
-
Are all hoses in good shape? If not have replaced.
-
Record the tank that needs repaired and contact maintenance to have it replaced.
-
Are there any water leaks on the extruder?
-
Please note the extruder zone with leak and contact maintenance for repair.
-
Clean up Water to prevent a slip hazard
-
Are there any oil leaks on the extruder?
-
Please note the equipment with leak and contact maintenance for repair.
-
Clean up Oil to prevent a slip hazard
-
Use this are to identify equipment that is damaged and in need of repair.
Preventative Maintenance
-
Type of Follow-Up
-
Give Description of the item
-
If necessary include photo of item.
-
Who is Responsible for item
-
Was Responsible party notified?