Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
PA tower system to be used
-
Max load of towers
-
Speaker system to be flown (make and model)
-
Total weight to be flown (inc cables,motors and frames)
-
Max wind speed
-
Ballast installed
-
Photo of location prebuild
-
Photo of stage left tower
-
Photo of stage right tower
Ground
-
Is the structure built on safe solid ground
Structure
-
Operation manual is held on site for reference
-
Speaker orientation correct
-
Inspect truss,flying frames,pins,link wires and accessories and confirm as fit for use
-
Fasteners are correct type, complete and in good condition
-
Span between suspensions is within design span of truss/flying frame
-
Load to be applied to truss span and points are within design limits
-
All PA flying wires/pins are fitted to flying frame
-
All PA flying wires/Pins are fitted to speaker cabinets
-
Pick points secure
-
Wind speed indicators fitted and working
-
No tools or other items left on or in truss/PA hang
-
Lifting or suspension sling potions on any trusses are at node points
-
Correct ballast installed
-
Handover to rigger/lifting operation supervisor
Secondary's/safety's
-
Can fall arrest equipment be used on this tower
-
Secondary suspensions installed
Signatures
-
Select date
-
Production managers signature
-
Signature from company