Visit Details
-
Job Number + Address + Postcode
-
Conducted on
-
Prepared by
- Perry Williams
- Jacob Manning
- James Attwood
- Taylor Scandrett
- Paul Sayers
- Dan Kimitri
- Other
-
Your Name
- Perry Williams
- Jacob Manning
- James Attwood
- Taylor Scandrett
- Paul Sayers
- Dan Kimitri
- Other
-
Your Name
-
Location
Visit Details
Risk Assessment
-
Hazard Analysis
- Dog
- Steps
- Working at Height
- Manual Handling
- Lone Working
- Electrical Hazard
- Slips, Trips or Falls
- Confined Spaces
- Adverse Weather
-
Ensure Dog is kept away from working area, ideally put into another room.
-
Did any of these Potential Hazards Require any Additional Control Measures?
-
What was the Hazard and What Control Measures were put in place?
-
Take care whilst on steps, especially when carrying equipment. Use hand rails where possible.
-
Remain vigilant at all times, carry out safe working at height practices and ensure working area is kept clear of any potential trip hazards.
-
Assess all loads before attempting to lift, know you have a clear route and wear manual handling gloves to prevent avoidable injuries.
-
When Lone working ensure you have notified someone when about to work at height, give rough estimated working at height time, and make contact when safely descended.
-
For safest working practices consider insulation, guarding, grounding, electrical protective devices.
-
Assess working area to find safest route. Clear all removeable Hazards before commencing work.
-
When working in confined spaces Noise pollution and dust inhalation will increase. Wearing Dust Mask and Ear Defenders will reduce any potential personal harm.
-
After waiting a suitable amount of time for the weather to change, please escalate the adverse weather conditions.
-
Image of A-Frame 'Men at Work' signage
Add DMEV
-
Which Room?
-
Was Fan Replaced?
-
How Was The Replacement Fan Mounted?
-
Which Method Was Used For Ridged Ducting?
-
Please Add More Detail
-
Vent Type
- Utilised Existing Ducting and Vent tile.
- New Vent + Ducting installed
- Other
-
What Vent Type?
-
Image of Replaced Fan
-
Changes to Electrical Supply?
-
Has The External Vent Been Replaced?
-
Image of External Vent
Add Alteration To Lighting
-
Which Room?
-
What type of fitting was changed?
-
Image of Replacement
Add Night Storage Heater
-
Heater Location
-
New Install or Exchange?
-
New Supply Added?
-
1 or 2?
-
Photo of Night Storage Heater
-
Photo of Serial Number
-
Serial Number
Add Downflow Heater (DFH)
-
Location
-
New Install or Exchange?
-
New Supply Added?
-
1 or 2?
-
Photo of Downflow Heater (DFH) Installed
Solar PV
-
Did You Add An Additional Fuse board?
-
Sub Board Installation Image
-
Image of Cable Entering Loft Through Felt Flap
-
Image of Inverter Display with Working Condition
-
Inverter Serial Number
-
Generation Meter Image
-
Generation Meter Serial Number
-
Image of DC Cable Safely Labelled
-
Stand as far back as Safely possible to get Wide Angle Image of Inverter and AC Isolator, Labelled with Glands etc
-
Solar Labels Installed?
-
Why were Solar Labels not installed?
-
Image of Installed Solar Labels
-
Was Dongle used?
-
Image of Dongle
-
Was Fire Detector Installed?
Visit Completion Checklist
-
Image of Fuseboard as it has been left
-
Image of Cut Out / Main Incoming Fuse
-
Has Certification been Completed and Uploaded?
-
Why has this not been completed?
-
Has the site been left clean and tidy?
-
Why was site not left tidy?
-
Is everything working as expected?
-
What is not working as expected and why?
-
Have you checked the customer is fully happy with all of the work that has been carried out?
-
Why not?
-
I have double checked that I have collected all Tools, Equipment and Chargers etc?
Follow Up Actions
-
Are Any Follow Up Actions Required?
-
What Actions / Materials are Required?
-
Who is Required to Take Action?
-
When is this Action Required?