Cover sheet
-
End Client
-
Customer Reference
-
Project Name
-
Quotation/Optiline/Estimate number
-
A55 Number(s) - If applicable/Known
-
PIANOI Number If applicable/Known
-
Site Address
-
Date job was started
-
Date job was finished
-
Gang leader Name
-
Document dated
-
Signed
-
Attach Map with locations of synthetics (If applicable)
Blockages
-
Click Add Blockage (+) to upload blockage details.
Blockage
-
Duct section number
-
Blockage number
-
12 digit Co-ordinates of blockage - Easting & Northing
-
Blockage type
-
Permit reference
-
Reinstatement dimensions Length and Width (m)
-
Site setup/Location photos SLG
-
Photos of surface before excavation
-
Photos of Damage/Blockage Repair Requirement
-
Photos of repair kit - Duct must be visible either side of repair kit and 3 x cable ties used and cut flush
-
Was the job cabled live?
-
Photo of back rope and or cable pulled through in each chamber
-
Completion photos - Reinstatement and site left clean and safe images
-
Is a return visit required to complete permanent reinstatement?
-
Please state any other relevant information with photo evidence – If applicable
New Track
-
Click Add New Track (+) to upload New Track details.
New Track
-
Total length of new track section (m)
-
Permit reference(s)
-
12 digit Start location Co-ordinates of - Easting & Northing
-
12 digit end location Co-ordinates of - Easting & Northing
-
Start chamber/Structure type
-
End chamber/Structure type
-
Total length and width of duct trench (m)
-
How many new duct bores have been laid in the trench
-
Length of duct in verge (m)
-
Length of duct in FW (m)
-
Length of duct in CW (m)
-
SLG Site setup/Location photos and surface condition before excavating
-
During Photos of new track laying in the open trench including tape measure to show duct has been laid at the correct depth
-
Completion photos – Ground reinstated
-
Photos of duct entrees completed to spec in chamber/structure at each end of duct length - including use of G
-
Is a return visit required to complete permanent reinstatement
-
Please state any other relevant information with photo evidence – If applicable
New Chamber
-
Click Add New Chamber (+) to upload New Chamber details.
New Chamber
-
Chamber type
-
Permit Reference
-
12 Digit Location Co-ordinates of - Easting & Northing:
-
Pre-Excavation Condition: Photos showing the ground and surrounding area before any excavation began and SLG site setup
-
Excavation Depth and Dimensions: Photos showing the dimensions and depth of the excavated hole before installing the chamber base.
-
Drainage or Gravel Layer: Show evidence of any drainage layer (like gravel or sand) at the bottom of the excavation to ensure water management.
-
Chamber completion (without cover on) showing: Soak away in base of chamber, duct entrances and sealing, chamber location.
-
Chamber completion cover on showing: Chamber label, chamber location.
-
Please state any other relevant information with photo evidence – If applicable