Title Page
-
Conducted on
-
Prepared by
-
Location
Untitled Page
PRE-INSTALL
-
Front door/ property access images
-
Floor covering images
-
Loft images (showing all parts of loft space)
-
Loft clear images (before/during)
-
Current insulation images
-
Current insulation depth images
-
Current boarding to be removed images
MID-INSTALL
-
Images of work taking place (half way through)
POST INSTALL
-
Images of insulation laid (showing all the loft space from each angle)
-
New Insulation depth images
-
Loft sign images (3x safety and ofgem
-
New boarding laid images
-
New eave vent images
-
New soffit vent images
-
New lap vent images
-
Newly fitted insulation jacket images
-
New pipe insulation images
PAPERWORK
-
Pibi filled in and signed by the client
-
Installers name