Title Page

  • Conducted on

  • Prepared by

  • Location

Loft survey

  • Size of loft (square metres)

  • Current insulation depth

  • Does the current insulation need replacing. If yes please explain why

  • Current insulation images

  • Is a loft clear required

  • Loft clear images

  • Size of boarding to be removed (square metres

  • Board removal images

  • Is there a tank requiring an insulation jacket

  • Tank images

  • How many metres of pipe work requires insulating

  • Pipe work images

  • How many fire hoods are required

  • Loft hatch and surround

  • Does the loft hatch need insulating. If not please explain why

  • How many metres of lap vents are required

  • How many eave vents are required

  • How many soffit vents are required

  • Ventilation images

  • Has a pibi been filled and signed by the client

  • Estimated time to complete work (2man)

  • Additional notes

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.