Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
PROCESS
-
The Lock Out - Tag Out process is systematically applied when working on energized equipment
-
There is evidence / examples of recent LOTO
-
LOTO Procedure is well understood by Managers and Supervisors
-
LOTO Procedure is well understood by the crewmembers
-
A list of activities subjected to LOTO is visibly posted, the personnel are aware and understand the list
-
All LOTO certificates are formally authorized by the Person In Charge
-
Contractors follow the LOTO procedure for services related to Saxon
-
LOTO always completed with conjunction to Permit to Work
LOTO DEVICES
-
LOTO equipment (board) is readily available at all times? General conditions (how many, where, etc)
-
Tags are waterproof to prevent tag from deteriorating or becoming illegible due to wet conditions and weather
-
Tags include legend such as Do Not Start, Do Not Open, Do Not Close, Do Not Energize, Do Not Operate
-
All isolation points are able to be isolated by positive means of locking
TRAINING
-
Personnel know the purpose and the use of the LOTO procedure
-
Energy isolation incidents / lessons learned are commonly distributed to the rigs
-
All personnel are familiar with the PTW process and LOTO supplemental checklists
-
Personnel recognize all type of energy sources requiring isolation through LOTO
Other Observations
-
Add media
Sign-off
-
Auditor
-
Site Manager