  • Document No.

  • Conducted By:

  • Conducted on

  • Personnel

  • Equipment/Area

  • LOTO Activity Type

  • Shift

Preparing for shutdown audit items:

  • The employee(s) has been trained in the general lockout/tagout procedure?

  • Date of training:

  • Does each employee have personal locks and tags available for use?

  • Record Lock Numbers.

  • Are all employee locks identified with employees name, department and picture? (Inspect all locks if employee has more than one lock).

  • Are the hazardous energy control procedures available in the work area?

  • The employee was able to identify all energy sources for the equipment involved?

  • The employee notified all affected employees in the area?

  • Is the LOTO procedure being followed appropriately?

Shutting down the equipment audit items:

  • The employee shut down all equipment involved using normal shutdown procedures (e.g., putting a switch in the "off" position or pressing a button)?

Isolating the equipment audit items: NOT APPLICABLE FOR ROUTINE LOCKOUT!

  • The equipment was isolated from every energy source feeding into it (e.g., close valves, throw main disconnects, throw circuit breakers)?

Applying lockout/tagout devices audit items:

  • Appropriate locks, tags, and lockout devices were available and utilized?

  • All employees involved were locked out using their own personal locks and tags?

Controlling stored energy audit items: NOT APPLICABLE FOR ROUTINE LOCKOUT!

  • All potential residual hazardous energy was relieved, disconnected, or restrained (e.g., mechanical, hydraulic, air, etc.)?

Verification of isolation audit items:

  • The equipment was tested to ensure the right system(s) we're locked out and to ensure that the equipment could not be operated?

Removing locks and tags audit items:

  • All tools and equipment has been removed from the area?

  • All personal lockout/tagout devices were removed by the employee who applied them?

  • Affected employees have been notified that locks and tags have been removed and the equipment is ready for use?

  • Is the employee aware of the procedure for removing a lock when the authorized employee cannot be found and the lock has to be removed?

Problems:

  • List any problems identified during the audit:

  • Photos

Resolution to problems identified:

  • List corrective actions taken to rectify the problems listed above:

Signatures:

  • Employee signature:

  • Auditor signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.