Title Page

  • Document No.

  • Audit Title

  • Conducted on

  • Prepared by

Address, Client, Operative Information

  • Client / Contract

  • Operative who carried out initial work:

  • Is Electrician on Site at time of Inspection

  • Address of the installation:
  • Date initial works complete:

Visual Inspections

  • Does the primary supply conductor information match the certificate?

  • Does the earthing system type match the certificate?

  • Are the main protective bonding conductors in place?

  • Are all accessories in an acceptable safe condition?

  • Is there a circuit schedule present at the consumer unit?

  • Are all details on the consumer unit's circuit schedule accurate?

  • Are all suitable warning labels present?

  • Is the consumer unit's enclosure satisfactory in terms of IP rating?

  • Does the circuit layout match the certificate's circuit schedule?

  • Are all circuit breakers of a suitable type and rating?

  • Are all terminations/connections within the consumer unit tight and secure?

Observations & recommendations.

  • Is the operatives summary on the condition report true and accurate?

  • Have all relevant Code 1's, 2's, or 3's been rectified or noted on the certificate?

  • Notes:

Claimed work and booked accessories

  • Do the booked accessories on operatives job sheet match that of the installation?

  • Notes:

Post Inspection Information.

  • Summary

  • Post inspection carried out by:

  • Post inspection carried out on:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.