Information
-
Work Centre
-
Auditor(s)
- Adrian Dinescu
- Adriano Torcia
- Andre Haaksma
- Antonio Cessaria
- Barb Thomas
- Colin O'Neill
- Dave Lacroix
- Debbie Burgess
- Erik Voss
- Graham Carruthers
- Hayden Hinds
- Jacques Arsenault
- Joe Meier
- Ken Ladouceur
- Kim McGoey
- Kugan Paramalingham
- Liz Donnelly
- Lucinda Longo
- Lucy Rodrigues
- Nicole Sciarra
- Pam Aibens
- Ramin Roshan
- Roy Mierdel
- Sheri Hurst
- Sikander Gill
- Tina Stavrinou
-
Audit Participant(s)
-
Conducted on
People
-
Has the operator been trained to requirements of the job and is the training matrix updated?
-
Are all personnel using all the posted Personal Protective Equipment?
Standardisation / Built in Quality
-
Is there a quality alert posted?
-
Are people trained on the alert & has it been signed off?
-
Is the work being performed to the instructions on the alert?
-
Are the work instructions at the work station?
-
Are they being followed and up-to-date?
-
Are all quality checks being performed to the Inspection requirements & documented? Are the requirements being met?
-
Has the process run sheet been verified / Safety Check Sheet / Changeover checklist?
-
Is the first off part present and tagged as per the First-off Procedure?
-
Are scrap racks / bins present & parts clearly marked & defective parts marked on the scrap sheets?
-
Per Inspection sheet / Control Plan, is gauge available & does have proper calibration stickers?
-
Is there lot traceability on the part?
-
Do the labels at the cell / line match the parts being produced?
-
Does the packaging match the packaging instructions?
-
Are the operators adding their employee # on the label or part?
More
-
Comments
Sign-off
-
Signature