Information

  • Work Centre

  • Auditor(s)

  • Audit Participant(s)

  • Conducted on

People

  • Has the operator been trained to requirements of the job and is the training matrix updated?

  • Are all personnel using all the posted Personal Protective Equipment?

Standardisation / Built in Quality

  • Is there a quality alert posted?

  • Are people trained on the alert & has it been signed off?

  • Is the work being performed to the instructions on the alert?

  • Are the work instructions at the work station?

  • Are they being followed and up-to-date?

  • Are all quality checks being performed to the Inspection requirements & documented? Are the requirements being met?

  • Has the process run sheet been verified / Safety Check Sheet / Changeover checklist?

  • Is the first off part present and tagged as per the First-off Procedure?

  • Are scrap racks / bins present & parts clearly marked & defective parts marked on the scrap sheets?

  • Per Inspection sheet / Control Plan, is gauge available & does have proper calibration stickers?

  • Is there lot traceability on the part?

  • Do the labels at the cell / line match the parts being produced?

  • Does the packaging match the packaging instructions?

  • Are the operators adding their employee # on the label or part?

More

  • Comments

Sign-off

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.