Information
-
Ichthys Project - CVL2
-
Location / Area
-
Conducted on
-
Conducted by:
-
Conducted by:
-
Location
-
Is the Supervisor nominated on the TRA supervising the works
-
Name of Supervisor
-
Has the TRA been signed by the workers
-
Comments
-
Add media
-
Is the TRA JOB Specific - Does the TRA reflect the current scope of works
-
Comment
-
Have the recommended controls been implimented
-
Comment
-
Add media
-
Review/Approved - Is there evidence that the TRA has been reviewed. has it been approved (approval signature)
-
Name of approver
-
Are the workers familiar with the process of modifying the TRA if there is a need to deviate from the original work method/s
-
Comment
-
Has the TRA been amended if the task has changed
-
Commnent
-
Is the TRA understood by workgroup - The scope of work, location, methodology, adjacent interface work and workgroups. Risks & controls (discussion to verify)
-
Are hazardous chemicals/substances being used listed on the TRA and is a copy of the SDS attached
-
Comment
-
Add media
-
Is the static plant and tools nominated correct and in good working order
-
Comment
-
Add media
-
Is the mobile equipment nominated correct and in good working order, with daily inspection records availible
-
Comment
-
Add media
-
Is the nominated safety equipment correct, in good working order and within inspection/compliance requiremnts
-
Comment
-
Add media
-
Are workers wearing PPE as nominated in the TRA
-
Comment
-
Is soft/hard barricading and signage in place and appropriate for the task
-
Add media
-
Weatherproof work pack information box - placed at the individual work location
-
Add media