Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Fire Protection
-
Are inspection tests up to date (every 6 months) for: Fire Extinguishers, Fire Hose Reels or any other fire fighting equipment?
-
Add media
-
Date of last inspection?
-
Is fire equipment marked with a location and identification marker?
-
Are all fire extinguishers and other fire fighting equipment accessible, clear from obstruction?
-
Add media
Construction Safety Plan
-
Has a Construction Safety Plan (CSP) been completed for the project / work?
-
Does the CSP contain emergency procedures?
-
Are the emergency procedures contained in the on site induction?
-
Does the CSP contain contract details of: Project supervisors, WHS Advisor/Officer, First Aid Officer, Emergency Coordinators (wardens), Emergency Out of Hours contact?
-
Does the CSP contain emergency contact details for local power supplier, gas supplier, telecommunications provider?
-
Does the CSP contain contact details for local police, fire, ambulance, doctors and poisons information?
General
-
Are Safe Work Method Statements (SWMS) available and signed off by all relevant on site workers?
-
Are SWMS in place and signed off by relevant workers for ALL high risk activities being performed?
-
Have all workers including contractors, sub-contractors received a site specific induction?
-
Is there evidence that all on site workers have produced a Construction Industry General Induction card?
-
Is a visitors register available?
-
Are incident / injury forms available?
-
Are Hazard Report forms available?
First Aid
-
Are there sufficient first aid kits in the workplace?
-
Are first aid kits checked on a regular basis?
-
Date of last check?
-
Are all the contents in date? (Check expiry dates)
-
Do contents of kits agree with contents lists?
-
Are first aid officers identities displayed? (Notice board, Site office, SMP-workers are aware of identities)
-
Are emergency telephone numbers displayed?
-
Are all injuries, incidents and near misses reported and recorded? (Forms available on site)
-
When first au d equipment is used, is it recorded of r re-stocking purposes?
-
Is a sharps kit available?
-
Is clean water available for first aid purposes?
Electrical
-
Is electrical equipment tested and tagged on a regular basis? (Check some equipment eg. tools, battery charges etc.)
-
If power is connected, is connected is a functional safety switch (RCD) installed?
-
Is the RCD manually tested to ensure correct operation?
-
Are correct power boards used (no double adapters or piggy back plugs)?
-
Are leads off the ground?
Signage
-
Are relevant signs displayed on or near equipment? (eg. hearing protection required)
-
Are unauthorised entry signs displayed?
-
Are signs in good condition? (Not faded, damaged)
-
Are Out of Service / Danger Tags available?
Personal Protective Equipment
-
Is appropriate PPE available and being used and maintained correctly?
-
All workers wearing safety boots?
-
Hearing protection is being worn by those in noisy areas?
-
Safety glasses are being worn when required and are available?
-
Hard hats are being worn when required and are available?
-
All hard hats are less than one year old (after issue)?
-
Riggers gloves or appropriate similar hand protection are being used when required or are available?
-
Respirators / dust masks are being used when required?
-
Respirators and dust masks are stored in sealed plastic bags?
-
Disposable dust masks are 2 strap type?
-
Is adequate signage in place where PPE is required to be used?
-
Add media
-
Is all PPE maintained in good condition? (Check some PPE)
Noise
-
Has noise exposure survey been conducted on all machinery?
-
Is the hearing protection provided appropriate for the level of noise emitted?
Hazardous Substances
-
Have all chemicals been identified?
-
Are all chemicals correctly stored?
-
Are containers clearly marked / labelled correctly?
-
Is there appropriate ventilation for use and storage?
-
Are Safety Data Sheets (SDSs) provided and available to all workers?
-
Is there an SDS register available on site? (Check if several hazardous substances found in the workplace are in the register)
-
Is there an appropriate decanting system in place for hazardous substances?
-
Is a spill kit available?
Lifting Equipment
-
Is all lifting gear tagged, current, stored appropriately and in a good condition?
-
Slings
-
Chains
-
Shackles
-
Lifting bars
-
Is the Safe Working Load (SWL) displayed on relevant lifting equipment? (Including lifting beams)
-
Are hooks used for slinging loads fitted with safety latches?
-
Is the correct lifting equipment being used for lifting activities?
Plant / Equipment / Machinery
-
Are ladders / steps in good condition?
-
Amber flashing lights and reverse beepers are operating when plant is mobile on site?
-
Operators hold appropriate licences / certificates?
-
Do trainee operators maintain a written training record / logbook as is required?
-
Are trainee operators supervised at all times?
-
Are daily checks conducted on all machinery and recorded in a log book?
-
Excavators?
-
Rollers?
-
Graders?
-
Other machinery including hired plant?
-
Is the plant correctly parked? (eg. Attachments, blades lowered, not idling unattended etc.)
-
Is plant/equipment free from damage and in good condition (no missing or damaged guards, no obvious leaks, tyres ok, etc.)
-
Is the plant / equipment appropriate for the job? (eg. Semi-tipper on steep gradient)
-
Is there evidence that safe work instructions in relation to plant / machinery are understood by workers?
-
Is there procedures in place for Lock Out Tag Out for cleaning, servicing and maintenance?
Hand Tools
-
Are hand tools in good condition? (Check some items)
-
Are handles or shafts free from splits, deep cuts or damage?
-
Are hand tool heads checked regularly to ensure they are secure? (Eg. Mattocks, sledge hammers, etc.)
Portable Power Tools
-
Are portable power tools in good condition? (Check some items)
-
Are adequate storage facilities provided?
-
Do workers use power tools correctly with Safety Switch (RCD)?
-
Are all guards in place?
Traffic Control
-
Does road signage in place match TGS (diagram)?
-
If traffic controllers are in place, is speed restricted to 60km/hr or less?
-
If traffic controllers are in place, are there flagman signs up on all approaches?
-
Are these signs covered when traffic controllers are not in place? (Eg. After shift or during breaks)
-
Are all road signs clean, legible and free from obstructions?
-
Are signs at correct heights? (Eg. 1.5m or 2.2m for long term work)
-
Is the delineation suitable and leaves no doubt which part of the roadway is available to traffics?
-
Are daily records kept detailing dates, all signs used, location and times etc.? (MUTCD Appendix A)
-
Do traffic controllers have traffic control licences and construction induction cards on site?
-
Is two-way radio communication between traffic controllers, site workers / plant operators and supervisors clear and concise? (Positive communication ie. all commands and instructions confirmed)
Barricading
-
Are barricades / bollards / witches hats erected around the work area where required?
-
Is there adequate safe access for pedestrians?
-
Are vehicles and plant not directly involved in construction activities parked clear of the work site and public thoroughfares so as not to contribute to any issues?
Work Areas
-
A the work areas tidy?
-
Are work areas cleaned regularly?
-
Does regular waste removal occur?
-
Are there adequate storage facilities?
-
Do workers use good storage and stacking techniques?
Amenities
-
Are toilets and hand washing facilities available in site or within a reasonable distance? (Eg. A shirt drive to depot - vehicle available)
-
Are suitable facilities available for meal breaks?
-
Is drinking water available? (Or workers advised in advance to bring their own)
Confined Spaces
-
Have all Confined Spaces been identified?
-
Is a Confined Space procedure in place?
-
Are Confined Spaces only entered by trained individuals?
-
Are the correct procedures being followed for Confined Spaces?
Corrective Actions
-
Enter any corrective actions that will be undertaken.
Sign Off
-
On Site Representative:
-
Name
-
Add signature
-
Select date
-
Inspection Auditor:
-
Name
-
Add signature
-
Select date