Audit
TYPE OF OCCURRENCE
- Delay
- Scope Change
- Damages
- Code Violation
- Warranty Violation
- Quality Control
- Other
RELATED TO:
- Engineering / Code
- Detailing
- Fabrication
- Unrecoverable Scope Change
- Installation
- Other
CAUSED OR DIRECTED BY:
- General Contractor
- Architect / Engineer
- Owner
- Inspector
- Supplier
- Southland Industries
- Other
Describe (Type here or use Sign function to write):
Add signature
IMPACTS:
- Extra Labor Cost
- Extra Metal Cost
- Overtime
- Schedule
- Move Crew
- Acceleration
- Extra Equipment Cost
- Out of Sequence
CORRECTIVE ACTION REQUIRED:
Describe (Type here or use Sign function to write):
Add signature
Daily time turned in?
Note on record drawings?
NOTIFICATIONS:
Company:
Reported to:
Southland
Reported by: