Title Page
TYPE OF OCCURRENCE
-
- Delay
- Scope Change
- Damages
- Code Violation
- Warranty Violation
- Quality Control
- Other
RELATED TO:
-
- Engineering / Code
- Detailing
- Fabrication
- Unrecoverable Scope Change
- Installation
- Other
CAUSED OR DIRECTED BY:
-
- General Contractor
- Architect / Engineer
- Owner
- Inspector
- Supplier
- Southland Industries
- Other
-
Specify (Type here or use Sign function to write):
-
Describe (Type here or use Sign function to write):
-
Add signature
IMPACTS:
-
- Extra Labor Cost
- Extra Metal Cost
- Overtime
- Schedule
- Move Crew
- Acceleration
- Extra Equipment Cost
- Out of Sequence
CORRECTIVE ACTION REQUIRED:
-
Describe (Type here or use Sign function to write):
-
Add signature
-
Daily time turned in?
-
Note on record drawings?
NOTIFICATIONS:
-
Company:
-
Reported to:
-
Southland
-
Reported by: