Title Page

  • Report number

  • Client / Site

  • Personnel conducting the report

  • What is time and date arrived on site

  • Please add location address including cross street and suburb incase of emergency
  • Are SWMS present for the task and has all Magellan staff read and understood them

  • Have all onsite inductions been completed with all team members having relevant, current qualifications on hand

  • Are all anchor points or points of attachment within their test date and in a good working order

  • Will all primary anchors sustain a force of at least 12KN and have any diverting anchors been checked for adequate strength

  • Are two independent rope anchors being used by each person

  • Does the team feel safe that work zone is free from live power or powerlines

  • Have all areas of work including anchor points been clearly de marked or barricaded from general public and any others trades working near by

  • Do all Magellan staff onsite have all appropriate PPE and is all in a good working order and within its expire dates

  • Has all onsite team members been trained in the safe use of a full bodied harness and is all approved fall protection being used within 3m of a dangerous edge

  • Have all team members checked their ropes for any wear and tear and are they adequate for the proposed works, touching the landing site and stopper knots or similar been applied

  • Are all members attaching to both ropes before suspending themselves

  • Are all members of the team using a "dead man", hands off type descender

  • Have all edge protection devises as well as any rope protection devises (for any grinding or similar type jobs) been applied and are they in good safe working order

  • Have all tool been appropriately attached via lanyard system so there is no chance of falling or coming loose

  • Have all tools / equipment over 8kg been suspended separately

  • Have all pockets been emptied of any loose items and all mobile phone type devises been attached to worker via approved case with lanyard

  • Have all tool been appropriately attached via lanyard system so there is no chance of falling or coming loose

  • Have all members of the team had enough rest and are free from fatigue

  • Are all members of the team free from and drugs and alcohol

  • Have any power tools been taken to site from Magellan warehouse if any have please list in notes

  • Add signature

  • Add signature

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.