Title Page
-
Inspection Location
-
Conducted By
-
Date of Inspection
-
Client PO/Job #
-
Wolff Energy Solution Job #
-
Scope of Works requested
-
Photo of Front of Property
Inspection Details
-
Inspection completed by
- Wayne Woodward
- Mitch Jackson
- Blake Edwards
- Mitchell Moir
-
Phone #
-
Licence No:
Inspection
-
Client discussion
-
Initial Observation
-
Area(s) to be MADE SAFE
-
Damage
-
Cause of Damage
-
Action taken
-
Next recommended action (if required)
Mud Map
-
show damaged area in relation to rest of property (ie image of whole room)
Photographic Records of Inspection Before/After works completed
- Before Pic
-
Name pic
After Pic
-
Name Pic
Health & Safety
Harness Evidence
-
Has access to roof been required?
Covid 19 Compliance Measures
-
Was the occupant of the property asked COVID-19 Triage Questions to identify possible COVID-19 risk immediately prior to attending site?
-
Did the contractor sanitise hands before and after inspection?
-
Did the contractor maintain 1.5metre distance from all occupants?
-
Was the contractor free of Flu-like symptoms before attending the site?
Report Authority
-
Inspection Completed By
- Wayne Woodward
- Mitch Jackson
- Blake Edwards
- Mitchell Moir
-
Position
-
Company
-
Licence #
-
Date