Title Page
-
Site/Facility
-
Conducted on
-
Prepared by
-
Location
Management of Change
Information
-
Change Initiator
-
Discription of proposed change
-
Area of Change
-
Proposed Date and Time to implement Change?
MOC Form
-
Does the affected personnel (e.g. operations, maintenance, contractors, etc.) require notification or training associated with this change?
-
Are operating procedures or maintenance procedures required to be updated as a result of this change?
-
Is additional training on new procedures required before the change?
-
Does P&ID or other drawings require updating based on change?
-
Is the PHA, Offsite Consequence Analysis or Emergency Response Procedures impacted by this Change?
-
Does the Process Safety Information require updating as a result of this change?
-
If the change includes new equipment, has the Mechanical Integrity and testing inspection requirements updated accordingly
-
Other impacts to Covered Process? (if Yes, list on notes)
-
Training and communications completed?
-
Pre-Startup Safety Review (PSSR) completed with change?
-
Any other actions required as part of this change?
-
List the person/s responsible and due date
Completion of MOC
-
Comments
-
Operations/Facility: Name and signature
-
Building Facility: Name and signature
-
Area Supervisor: Name and signature
-
Bldg. or Utility Operations Engr: Name and signature
-
Safety Officer: Name and signature