Title Page

  • Site/Facility

  • Conducted on

  • Prepared by

  • Location

Management of Change

Information

  • Change Initiator

  • Discription of proposed change

  • Area of Change

  • Proposed Date and Time to implement Change?

MOC Form

  • Does the affected personnel (e.g. operations, maintenance, contractors, etc.) require notification or training associated with this change?

  • Are operating procedures or maintenance procedures required to be updated as a result of this change?

  • Is additional training on new procedures required before the change?

  • Does P&ID or other drawings require updating based on change?

  • Is the PHA, Offsite Consequence Analysis or Emergency Response Procedures impacted by this Change?

  • Does the Process Safety Information require updating as a result of this change?

  • If the change includes new equipment, has the Mechanical Integrity and testing inspection requirements updated accordingly

  • Other impacts to Covered Process? (if Yes, list on notes)

  • Training and communications completed?

  • Pre-Startup Safety Review (PSSR) completed with change?

  • Any other actions required as part of this change?

  • List the person/s responsible and due date

Completion of MOC

  • Comments

  • Operations/Facility: Name and signature

  • Building Facility: Name and signature

  • Area Supervisor: Name and signature

  • Bldg. or Utility Operations Engr: Name and signature

  • Safety Officer: Name and signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.