Title Page
-
Site conducted
-
Client / Site
-
Conducted on
-
Prepared by
-
Name(s) of Person(s) Participating in Inspection:
-
Location
-
Number of Employees on Site
General
-
Supervisor / Foreman at time of this inspection
-
Select site weather conditions at time of this inspection (select all that apply)
- Clear Sky
- Cloudy
- Raining
- Windy
- Hazy
- Snow / Hail
- OTHER
-
Describe weather conditions on site today
-
Minimum temperature today?
-
Maximum temperature today?
-
Current activities being undertaken on site (select all that apply)
- Asbestos Abatement
- Abrasive Blasting
- Cleanup
- Coatings
- General
- Insulation
- Lead Removal
- OTHER
- Scaffolding
- Siding
-
Describe activity being undertaken on site
Safety Audit
Administrative / General Inspection
-
Is Administrative/General Inspection to be conducted during this audit?
-
Federal and State Posters are posted and up to date.
-
Daily/Weekly Safety Meetings documented.
-
Supervisor Safety Inspections are being conducted throughout the week.
-
JHA/JSA are completed for each task and reviewed daily.
-
Emergency phone numbers and evacuation procedures posted.
-
BBP and First Aid kit available and adequately stocked for workplace manpower.
-
Monthly/Quarterly Equipment Inspections completed (Color Tape).
-
Scaffold log available and up to date.
-
Work areas properly signed/barricaded.
-
Sign In/Out Log completed and accurate.
-
OSHA 300 Summary Posted (Feb. 1 – Apr.1).
-
Drinking water is available.
-
Sanitary facilities available.
Housekeeping
-
Is housekeeping to be inspected during this audit?
-
General housekeeping is neat and orderly
-
Materials stored away from unprotected edges.
-
Scrap materials have been removed or stacked in an orderly fashion.
-
Scrap materials are not creating a slip/trip/fall hazard (i.e. clear aisles and stairs)
-
Waste is disposed of in appropriate containers.
-
No spills of liquid materials are creating a slip/trip/fall hazard.
-
Work areas have the appropriate amount of lighting.
Fire Prevention
-
Is fire prevention being inspected during this audit?
-
Sufficient fire extinguishers provided, of the correct type.
-
Exits marked/accessible.
-
Flammable and combustible substances are safely stored and labeled in approved safety cans/cabinets.
-
Flammable material containers are properly bonded when transferring liquids.
-
Flammable and combustible materials are stored a safe distance from heat generating equipment.
Personal Protective Equipment/PPE
-
Is Personal Protective Equipment/PPE to be inspected during this audit?
-
Proper equipment available for existing or potential hazards.
-
Safety supplies adequate for job manpower.
-
Employees issued appropriate PPE for assigned tasks.
-
Eye and face protection available and utilized (i.e. safety spoggles, face shield)
-
Hearing protection available, utilized and properly maintained
-
Hand protection available, utilized and properly maintained
-
Hard hats available, utilized and properly maintained
-
Appropriate clothing worn by employees (No synthetic materials).
-
Foot Protection worn as required by all employees (No synthetic materials).
Respiratory Protection
-
Is Respiratory Protection to be inspected during this audit?
-
Respirators available, maintained, and stored properly.
Abrasive Blasting
-
Is Abrasive Blasting to be inspected during this audit?
-
Equipment hoses are not creating a tripping hazard.
-
Hose couplings have lock pins and whipcheck.
Fall Protection
-
Is Fall Protection to be inspected during this audit?
-
Wall and floor openings are covered/guarded and marked appropriately.
-
Adequate fall protection provided and utilized at > 4ft. (100% tie off required on all scaffold)
-
Fall protection equipment inspected quarterly and documented.
-
Appropriate anchorage locations are utilized.
Hand Tools/Power Tools
-
Hand Tools/Power Tools to be inspected during this audit?
-
Tools stored in a secure location and maintained in an orderly fashion.
-
All guards and safety devices in place and operational.
-
Correct tools available and utilized for the job.
-
Inoperable/Unsafe tools are destroyed or tagged and repaired.
-
Operators of PAT’s are trained.
Electrical Safety
-
Electrical Safety to be inspected during this audit?
-
GFCI’s are available/maintained/utilized.
-
Temporary lights are equipped with guards
-
Electrical cords strung so they do not hang on pipes, nails, hooks, etc.
-
Energized panels/device outlets are covered.
-
Damaged electrical cords are removed from use.
-
Locks & tags are identifiable to each employee
-
Group lock boxes available for group LOTO.
-
Sub sheets utilized for group TagOut in PowerGen facilities.
-
Locks and tags are removed by the owner of the lock.
Company Vehicles/Powered Industrial Trucks
-
Are Company Vehicles/Powered Industrial Trucks to be inspected in this audit?
-
Equipment and vehicles are parked so as to prevent the release of stored energy.
-
Equipment and vehicles are maintained in good working order.
-
Seatbelts are available and in use by all operators and passengers.
-
Current licenses maintained for all vehicle drivers on or off road.
-
Equipment and vehicle operators are trained and possess an operators permit.
-
Spotters are used as conditions deem it necessary.
HAZCOM/Right to Know
-
Is HAZCOM/Right to Know to be inspected in this audit?
-
Materials properly stored and labeled.
-
Spill kits available.
Ladders
-
Are ladders to be inspected in this audit?
-
Ladders inspected, in good condition, and properly stored.
-
Ladders are of appropriate duty rating and size for the task.
-
No stepping on top two rungs of stepladder.
-
Ladders extend at least 36” above top of landing.
-
Step ladders fully opened when in use.
Scaffold
-
Are scaffolds to be inspected in this audit?
-
Erection, Dismantling, and Modification properly supervised
-
Scaffolds have secure foundations with mud sills, base plates, and screw jacks.
-
Scaffolds plumb and square with proper cross bracing.
-
Guardrails, midrails, and toe boards in place.
-
All working-level platforms fully planked/decked.
-
All platforms at least 18” wide or protected by guardrail system or PFAS.
-
Platforms properly constructed with scaffold grade lumber/planks.
-
Scaffold levels are being completed as the scaffold is erected.
-
Safe access provided and adequate.
-
SRL’s are provided for ladder access ≥ 10’ above a lower level or where an employee could fall into dangerous equipment.
-
Competent person has inspected scaffold prior to each shift scaffold is in use.
-
Scaffold tag displayed at every point of access.
Confined Space
-
Is confined space to be inspected in this audit?
-
Proper permits executed, posted, and retained.
-
All entrants are wearing a PFAS harness.
-
Continuous air monitoring being performed and documented.
-
Sign In/Out sheet in use.
-
Emergency procedure and phone numbers documented.
-
Attendant in present and performing monitoring from outside.
Hazardous Material Operations
-
Is Hazardous Material Operations to be inspected in this audit?
-
Properly supervised by a Competent Person.
-
All required permits/notifications executed and retained.
-
Waste is adequately wet, properly bagged, labeled, and promptly removed from work area.
-
Waste containers are secured, lined, and labeled.
-
Containments properly constructed.
-
Warnings and barricades in place.
-
Containment security maintained.
-
Appropriate PPE available and in use.
-
Decon areas properly constructed, maintained, sanitary.
Welding and Cutting
-
Is welding and cutting to be inspected in this audit?
-
Properly stored, inspected, and maintained.
-
Proper PPE available and in use.
-
Hot work permits in use.
-
Fire watch is use during and after hot work activities
-
Tools being used properly.
-
Gas cylinders secured and upright.
Hoists/Rigging
-
Are Hoists/Rigging to be inspected in this audit?
-
Hoists used properly.
-
Correct rigging procedures followed (i.e. barricade in place, away from suspended load).
-
Tag line in use to guide loads.
General Comments
-
Any further comments or recommendations arising from this inspection?
-
Add any additional relevant photos
-
Have all required corrective actions been added as Actions to this inspection?
-
Please add any corrective actions to the appropriate questions above before completing this report
Sign Off
-
Name & Signature of Inspector
-
Name & Signature of Site Supervisor / Foreman