Title Page

  • VIN

  • BSN

  • Build Label Picture

  • ROT#

  • Seat Weight

  • Capture.JPG
  • Are tracks marked with star as shown?

  • Is this a Recaro Seat?

Pre Launch Package Checklist

  • Second Row SCCAF Review (SC, CC, HI, HIC, PIST, Critical to Quality Torques & Process Steps)

  • H-point and Efforts Measurements (100% for TT)

  • BSR Evaluation (100% for TT)

  • Appearance Approval (Review of physical properties for compliance to approved boundary manual)

  • Pre-Ship Individual Seat Photos (Post-approval photo taken prior to shipment to FRAP, stored electronically)

  • Seat Photos

Final Inspection

  • RSB J-CLIP Closed

  • RSC J- Clips connected correctly

  • RSC foam opening for fuel harness

  • Exceptions/ Notes

  • Any area of concern?

  • Photos of Concern

SIGN-OFFs

  • Quality Engineer

  • Quality Manager

  • Plant/ Operations Manager

  • Production Manager

  • Materials Manager

  • JIT Engineering Support

  • JIT Program Support

  • Ford STA

  • FRAP Rep

  • Ford PD

Pre Launch Package Checklist

  • First Row SCCAF Review (SC, CC, HI, HIC, PIST, Critical to Quality Torques & Process Steps)

  • Second Row SCCAF Review (SC, CC, HI, HIC, PIST, Critical to Quality Torques & Process Steps)

  • H-point and Efforts Measurements (100% for TT)

  • BSR Evaluation (100% for TT)

  • Manual Function Final Verification (Power functions verified during EOL test)

  • Appearance Approval (Review of physical properties for compliance to approved boundary manual)

  • Pre-Ship Individual Seat Photos (Post-approval photo taken prior to shipment to FRAP, stored electronically)

  • Seat Photos

Final Inspection

  • FSB Bezel = No Top Gap (Bite Rework)

  • FSB Dump Function Verification

  • FSB Toe Kick Stiffener In Place

  • FSC Recliner Handle w/Bumper

  • FSC I/B Shield Correct

  • Track Covers on Correct Foot

  • FSB/FSC Harness/Motor Connector Verification

  • Verify recliner functionality of seat

  • Verify Memory/CCS Module-BA Level, CCS only- AA level

  • Correct OCS Bladder#

  • Correct TPS Routing

  • FSB H/R Salvage Direction Straight

  • FSB/FSC Stripe Side-to-Side Consistent

  • RSB J-CLIP Closed

  • RSC J- Clips connected correctly

  • RSC foam opening for fuel harness

  • Dummy plug connected(if applicable)

  • Exceptions/ Notes

  • Any area of concern?

  • Photos of Concern

SIGN-OFFs

  • Quality Engineer

  • Quality Manager

  • Plant/ Operations Manager

  • Production Manager

  • Materials Manager

  • JIT Engineering Support

  • JIT Program Support

  • Ford STA

  • FRAP Rep

  • Ford PD

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.