Title Page
-
VIN
-
BSN
-
Build Label Picture
-
ROT#
-
Seat Weight
-
Are tracks marked with star as shown?
-
Is this a Recaro Seat?
Pre Launch Package Checklist
-
Second Row SCCAF Review (SC, CC, HI, HIC, PIST, Critical to Quality Torques & Process Steps)
-
H-point and Efforts Measurements (100% for TT)
-
BSR Evaluation (100% for TT)
-
Appearance Approval (Review of physical properties for compliance to approved boundary manual)
-
Pre-Ship Individual Seat Photos (Post-approval photo taken prior to shipment to FRAP, stored electronically)
-
Seat Photos
Final Inspection
-
RSB J-CLIP Closed
-
RSC J- Clips connected correctly
-
RSC foam opening for fuel harness
-
Exceptions/ Notes
-
Any area of concern?
-
Photos of Concern
SIGN-OFFs
-
Quality Engineer
-
Quality Manager
-
Plant/ Operations Manager
-
Production Manager
-
Materials Manager
-
JIT Engineering Support
-
JIT Program Support
-
Ford STA
-
FRAP Rep
-
Ford PD
Pre Launch Package Checklist
-
First Row SCCAF Review (SC, CC, HI, HIC, PIST, Critical to Quality Torques & Process Steps)
-
Second Row SCCAF Review (SC, CC, HI, HIC, PIST, Critical to Quality Torques & Process Steps)
-
H-point and Efforts Measurements (100% for TT)
-
BSR Evaluation (100% for TT)
-
Manual Function Final Verification (Power functions verified during EOL test)
-
Appearance Approval (Review of physical properties for compliance to approved boundary manual)
-
Pre-Ship Individual Seat Photos (Post-approval photo taken prior to shipment to FRAP, stored electronically)
-
Seat Photos
Final Inspection
-
FSB Bezel = No Top Gap (Bite Rework)
-
FSB Dump Function Verification
-
FSB Toe Kick Stiffener In Place
-
FSC Recliner Handle w/Bumper
-
FSC I/B Shield Correct
-
Track Covers on Correct Foot
-
FSB/FSC Harness/Motor Connector Verification
-
Verify recliner functionality of seat
-
Verify Memory/CCS Module-BA Level, CCS only- AA level
-
Correct OCS Bladder#
-
Correct TPS Routing
-
FSB H/R Salvage Direction Straight
-
FSB/FSC Stripe Side-to-Side Consistent
-
RSB J-CLIP Closed
-
RSC J- Clips connected correctly
-
RSC foam opening for fuel harness
-
Dummy plug connected(if applicable)
-
Exceptions/ Notes
-
Any area of concern?
-
Photos of Concern
SIGN-OFFs
-
Quality Engineer
-
Quality Manager
-
Plant/ Operations Manager
-
Production Manager
-
Materials Manager
-
JIT Engineering Support
-
JIT Program Support
-
Ford STA
-
FRAP Rep
-
Ford PD