Title Page
-
Document No.
-
M&S Store Christmas hooks and power survey
-
To be completed alongside VM personnel
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Store location
-
Add location
-
Time and date of survey
-
Select date
-
How many extra hooks are to be installed throughout store ?
-
Please list any obstructions in which decorations can not be installed in new suggested locations, for example : obscuring of main store signage, asbestos....... (Specific location along with photo to be attached below)
-
Add media
-
Please List below the locations were the suggested new hooks can be installed along with photo.
-
Add media
-
Is there available electrical supply at all suggested locations ? ( if not specify locations below and add photos below )
-
Add media
-
Please list below materials / access equipment required if sockets are to be installed
-
Please state Below estimated hours along with number of engineers required
-
Is the work to be carried out of working hours ?
- yes
- no
-
Please state below after walkthrough how many hooks and how many power supplies are to be installed
-
Engineer
-
VM Personnel