Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
INDUSTRY INDUCTION LICENSES
-
Is the installer carrying industry induction card?
PPE
-
Hearing protection
-
Eye protection
-
First aid kit
-
Safety vest or high vis polo
-
Safety footwear
-
Dust mask rated P2 for MDF cutting
-
Hard hat
-
Safety Gloves
ESSENTIAL EQUIPMENT
-
Cutting warning sign
-
Tool tagging date on tools (test due date)
-
Licensed test and tag certificate number (located on log sheet)
-
Are there any tools or equipment that do not have an up to date test and tag
-
Take a photo of a tag
-
Safety guards in place on all tools
-
NO double adapters in use
-
Grinder and or Polisher with guards, on site, in good condition
-
Photo of Grinder and or Polisher
SAFETY DOCUMENTS AND REGISTERS
-
Is installers folder, including safety management documents, MSDS, tool tag registers, incident forms etc in work vehicle
-
Are chemicals used on site only of those that are authorised on the MSDS Registers?
-
How many builders audits have been conducted in the last 3 months
-
CORRECTIVE ACTIONS This section is for non conformity. For any audit questions that's are answered as 'NO' or 'INSUFFICIENT' must have a corrective action entered here. This must detail what needs to be done to rectify the non conformance.
-
Due date for corrective actions
-
Please list any other relevant information, requests, or comments
-
I declare the information listed above has been supplied and sited as current and complies with Clayton's safety standards
-
Auditors signature
-
Installers signature