Untitled Page

MATERIAL:

  • Has all the steel been delivered?

  • Is there adequate hardware?

  • Has the frame material been delivered?

SLAB:

  • Is there slab, frame or column overhang?

  • Has the slab been laser levelled?

  • Has the termite barrier been installed?

SITE:

  • Is there power onsite?

  • Is a generator required?

  • Has the site clean been completed?

  • Has the temp fencing, toilet, bin and OH's sign been installed?

  • Is their running water?

DELIVERIES

  • Is there clear access in the street?

  • Is there clear access in the driveway for deliveries? e.g no piles of dirt, holes and the ground is firm

  • Are there overhead powerlines?

  • Is a franna needed?

PROCESS:

  • Are all columns installed plumb, studs pinned and anchor bolts installed?

  • Are all beams installed level and with the correct bolted connections?

  • Are cleats welded to columns if they have overhang?

  • Is the site left clean?

  • Was there any rectification work needed?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.