SURVEYOR, PRIVATE FRAME REPORT

  • Did the job pass

  • All private report items complete

  • Frame written up items complete

  • Other trade email items complete

WINDOW INSTALL

  • All opening are correct as pre-plans and All windows installed

  • Windows/door frames are leveled and plumbed and packed correctly, the write way around

  • All window sashes/panels installed

  • All header windows gap less than 35mm and block correctly also greater than 10mm

  • SQ.set windows are flush with frames

  • Kitchen/Gallery windows at 920/940mm off floor, plumb, level (bottom & top), bottom sill at least 20mm lower to allow stones go through. Top windows level and countersink secure leveled

  • Stiffening board installed under Kitchen/Gallery windows (Valleyboards, floorboards block at 2 ends and 900 cents at middle

  • Window protection/rails in place.

  • Sliding doors are installed correctly with 3 screws and L brackets underneath

  • Flashings installed to sill section of timber windows and timber framed doors.

  • Big void window is level/plumb not bow at midde

PRE - PLASTER ITEMS

  • Voids from ground to first floor alignment

  • Wall plumb (+/- 4mm over 2.0m)

  • Flooring level (+/- 4mm over 2.0m, or 10mm in a room)

  • Sheet flooring nailed off and not squeaking.

  • Nails hit flat at internal ply braces

  • Top and bottom wall plates secure and straight/alignment

  • Walls Nog's installed correctly

  • Ceiling trimmer installed correctly

  • Change direction over joists at lower

  • Bulkheads level and installed (+/- 4mm over 2.0m) level.

  • Columns plumb and square with no twist.

  • Change of direction nog's installed at direction change of roof trusses and where required (all bay)

  • Man hold frame out

  • Garage ceiling drop

  • Garage nogs for roller doors and pack 2 sides at least 120mm wide

  • Alfresco battons/ ensure have 2 ends timbers to pick plasters

  • All temp props off / off cuts placed in rubbish cage. Left over timber stacked neatly in the garage. House swept out and clean.

HEBEL/ BRICK ITEMS

  • Balcony frame out

  • All bolts cut off

  • Garage opening correctly

  • Drop porch/alfresco

  • Column frame out, studs to steel block out

OTHER ITEMS

  • Any other items

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.