Project Site Audit
Visible
-
AF2 Displayed
-
Emergency first aid details
- Yes - in date
- Yes - incorrect date
- On site but not displayed
- No
- Not Required
-
HSE Poster
- Yes - in date
- Yes - incorrect date
- On site but not displayed
- No
- Not Required
-
Health & Safety Policy
- Yes - in date
- Yes - incorrect date
- On site but not displayed
- No
- Not Required
Records on Site
-
Construction Phase Plan
-
RAMS
-
Competence records
-
Signing in Book
-
Induction records
-
Toolbox talks
-
Accident book
Fire Plan and Emergency Procedures
-
Fire Plan displayed/known
-
Escape routes clear
-
Assembly points identified
-
Means of raising the alarm
-
Signage adequate
-
Lighting adequate
-
Smoking prohibited on site
Waste
-
Safe waste removal / procedures in place.
COSHH
-
Harmful substances identified
-
Safe working practices adhered to
-
COSHH assessments on record
-
Subcontractor COSHH assessments on record.
Permit to Work
-
Permit to work required
-
Records retained on site
Work Segregation
-
Are works adequately segregated
-
Method of segregation on site
-
Adequate warning signage on site
Welfare Facilities
-
Welfare Facilities available on site
- Yes - Onsite Facilities available
- Yes - Facilities provided by over-seeing PC
- No
- N/A
-
Are they clean and adequate?
-
Wash basins present
-
WCs present
-
Resting facilities
-
Provision to fresh air
-
Suitable temperature and weather protection
-
Adequate lighting provisions
First Aid
-
Provision of first aid on site
- Yes - Onsite Facilities available
- Yes - Facilities provided by over-seeing PC
- No
- N/A
-
Eyewash facility
- Yes - Onsite Facilities available
- Yes - Facilities provided by over-seeing PC
- No
- N/A
Safe Place of Work
-
Working area accessible
-
Stable structure
-
Working area and access adequately lit
Personal Protective Equipment
-
PPE worn when required
-
Condition of PPE
-
Addition PPE requirements
Working Practices
Manual Handling
-
MH Assessments adhered to
-
Mechanical alternatives used
Ladders
-
Ladders being utilised at the time of visit
-
Condition of ladders
-
Slip prevention present
-
Prevention of overreaching?
-
Is the ladder resting against a solid surface?
Electrical Safety
-
Maximum supply of 110v
-
Trip / RCD devices
-
Condition of Cables
-
Trailing cables protected
-
Testing and maintained procedures in place
-
Isolation of supply when required
Tools & Equipment
-
Right for the task/job
-
Condition
-
Inspection and maintenance records available
Noise
-
Adequate exposure controls in place
-
Reduction at source
-
Hearing defenders
Vibration
-
Risk of vibration present on project?
-
Adequate procedures and recordings in place
-
Trigger times identified
Traffic and Vehicles
-
Control of Traffic & Vehicles part of the project?
- Yes
- Yes - Controlled by over-seeing PC
- Not Required
- No
-
Suitable routing of traffic
- Yes
- Yes - Controlled by over-seeing PC
- Not Required
- No
-
Adequate Reversing areas
- Yes
- Yes - Controlled by over-seeing PC
- Not Required
- No
-
Adequate Speed limits
- Yes
- Yes - Controlled by over-seeing PC
- Not Required
- No
-
Banks men
-
Parking
-
Pedestrian routes and crossing points where required
- Yes
- Yes - Controlled by over-seeing PC
- Not Required
- No
On Site Monitoring
-
Evidence of on-Site Monitoring
-
Subcontractor Monitoring
Asbestos
-
Is asbestos present in the premises?
-
Management procedure in place?
-
Asbestos details covered in induction?
Working at Height
Scaffold
-
Scaffold present on site
-
Toe boards suitable
-
Platforms clean and fee from debris
-
Have 7 day inspections been undertaken?
-
Inspection records kept
-
Scaffold tags present
-
Safe access / egress
-
Ladders secured
Scaffold towers
-
Scaffold towers present on site
-
Wheels locked
-
Operatives PASMA qualified
-
Stable ground
-
Guard rails
-
Toe boards
Mobile Elevating Working Platforms
-
MEWPs present on site?
-
Stable ground
-
Operator competence (IPAF)
-
SWLs known / displayed
-
Inspection records
Roof work
-
Roof access required?
-
Stability of Roof
-
Public/People working or living below roof
-
Have weather conditions been considered?
-
Harnesses required?
-
Worn?
Lifting Equipment
-
Lifting equipment on site
-
12 month testing
-
Appointed person
-
Signaler where required
ACTIONS
-
Actions to be followed up/implemented
-
Action comments below: