Title Page

  • Kitchen & Bathroom Handover

  • Room Type

  • Operative Completing Checklist

  • Full Address

Handover Checklist

  • Plaster work is smooth, even and free from rough areas, bumps, cracks, and is neatly finished around sockets, switches, and corners.

  • All paintwork is completed and free from blemishes and chips.

  • All surfaces are clean and free from cracks and scratches.

  • Wall tiling is set out correctly with even cuts at both ends, fully grouted and neatly finished between tiles and around sockets.

  • Flooring is laid level and free of unevenness.

  • Worktop, sink, underneath sink and taps sealed properly.

  • All units and worktops are fixed properly, level, free from damage, have shelving and have neat cut outs for pipework / cables.

  • No leaks in pipes or underneath sink/whb.

  • Extractor fan and smoke detectors work properly and are fitted correctly.

  • Ensure provision for gas and electric cooker, and that it has a cooker chain (if gas cooker).

  • New light fitting installed and correctly working. All lights turn on and off.

  • Sockets and outlets are working, secure and level.

  • Surestop / Stop tap working.

  • Kitchen/bathroom/wetroom handover pack left on site.

  • Any other notes or snags to list?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.