Title Page
-
Kitchen & Bathroom Handover
-
Room Type
-
Operative Completing Checklist
-
Full Address
Handover Checklist
-
Plaster work is smooth, even and free from rough areas, bumps, cracks, and is neatly finished around sockets, switches, and corners.
-
All paintwork is completed and free from blemishes and chips.
-
All surfaces are clean and free from cracks and scratches.
-
Wall tiling is set out correctly with even cuts at both ends, fully grouted and neatly finished between tiles and around sockets.
-
Flooring is laid level and free of unevenness.
-
Worktop, sink, underneath sink and taps sealed properly.
-
All units and worktops are fixed properly, level, free from damage, have shelving and have neat cut outs for pipework / cables.
-
No leaks in pipes or underneath sink/whb.
-
Extractor fan and smoke detectors work properly and are fitted correctly.
-
Ensure provision for gas and electric cooker, and that it has a cooker chain (if gas cooker).
-
New light fitting installed and correctly working. All lights turn on and off.
-
Sockets and outlets are working, secure and level.
-
Surestop / Stop tap working.
-
Kitchen/bathroom/wetroom handover pack left on site.
-
Any other notes or snags to list?