Title Page
-
MIDLAND BUILDING PRODUCTS
-
5/2/24
-
LEE ROCHESTER
-
MAINTENANCE DEPT
MAINTENANCE ROOM
-
IS THE AREA CLEAN AND ORGAINISED
-
ARE SPARES ORGANISED INTO ORDER ?
-
HAS ALL BROKEN SPARES BEEN REPAIRED WERE POSSIBLE ?
-
ARE NON REPAIRABLE PARTS DISPOSED OF ?
-
IS WORK STATION CLEAR AND ORGANISED ?
-
HAS ALL RUBBISH / BINS BEEN EMPTIED ?
-
ARE ALL FASTENERS /FIXINGS ORGANISED ?
-
ARE TOOLS ALL ORGANISED AND IN ONE AREA ?
-
ALL AIR PIPES / ELECTRICAL CABLES HANGING UP ?
CUPBOARDS
-
ARE CUPBOARDS ORGANISED ?
-
ARE ALL CONSUMABLES PUT AWAY AND ORGANISED NEATLY ?
-
ARE ALL ELECTRICAL SPARES ALL IN ONE AREA AND ORGANISED ?
-
IS ALL LIFTING GEAR SPARES ORGANISED AND IN ONE AREA?
SHOPFLOOR
-
ARE ALL DUCTING SPARES IN ONE AREA ?
-
ARE ALL ROLLER SHAFTS LABELLED AND PUT AWAY ?
-
ARE ALL EXTRACTION HOSES PUT AWAY AND STORED IN ONE AREA?
-
HAVE ALL MAINTENANCE SPARES ON THE SHOP FLOOR BEEN RE ALLOCATED TO CORRECT AREA?
DAILY MAINTENANCE CHECKS
-
WHEN A REPAIR HAS TAKEN PLACE , HAS ALL RUBBISH AND BROKEN PARTS BEEN DISPOSED OF?
-
HAVE LIFTING GEAR CHECKS TAKEN PLACE FIRST THING ?
-
HAVE GLUE LINE CHECKS TAKEN PLACE FIRST THING ?
-
HAVE DAILY SHEETS BEEN FILLED IN ?
-
HAVE OUTSTANDING TICKETS BEEN COMPLETED AND CLICKED OFF?
-