Title Page
-
Site conducted
-
Plot Number
-
Conducted on
-
Prepared by
-
Name of 2nd fix engineer
Distribution board
-
Has the Distribution board been 2nd fixed, with all Busbar covers, blanks and board cover intact
-
Is the distribution board installed at the correct height- MCB's to be within 1350-1450mm FFL
Lighting
-
Are all lights installed as per RCP
-
Take Photo
-
Are the correct fittings installed as per locations i.e bathroom IP rated downlights if applicable
-
Take photo
-
Are all lighting left in a safe manner, that once tested can be put into service
-
Take Photo
-
has all functional switches been installed, and are level
-
Take Photo
-
Has the external lighting been installed where applicable
-
Add media
Power
-
All sockets and power accessories connected, fixed back against wall and level
-
Take Photo
-
are all service accessories connected in utility cupboard
-
Photo
-
Are all kitchen appliance accessories connected, and correct type I.E unswitched socket, flex outlet etc .
-
Take Photo
-
all Kitchen above work top finished accessories connected to enable testing where unable to fit final accessories due to tiles/splashback etc
-
Take Photo
ELV
-
Has the door entry unit beed installed?
-
Take Photo
-
Has the data plate been installed in utility cupboard with a correct accessories I.E master RJ11 and RJ45
-
Take Photo
-
Has secondary RJ11 and where applicable RJ45 been installed in media plate and other locations
-
Take Photo
-
Has Quadplexor TV plate, and IEC return where applicable been installed in media plate, and TV point been installed in all bedrooms where applicable
-
Take Photo
Smoke detectors
-
has all heat and smoke detectors been installed with commissioning bags
-
Take Photo
-
Has the relay base and external sounder been fitted where applicable
-
Take Photo
Towel Rails/ Shavers/Thermostats
-
Has all thermostats been installed as per current drawing revision?
-
Take Photo
-
Has all flex outlets been installed for the towel rails where applicable and able to at 2nd fix stage or made safe
-
Take Photo
-
Has the shaver sockets been fitted where can at 2nd fix stage or been made safe
-
Take Photo
-
Any holes been made due to cables being brought out incorrect location by others take pictures
Testing
-
Has dead testing been completed with no faults found
-
Picture of damages
Sign off
-
add photos of the finished plot
-
Add date of completion of 2nd fix
-
Please sign as complete