Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Untitled Page
-
1.1 What is the current issue number of the MCERTS Standard?
-
1.2 Has it changed since the previous external QMS visit?
-
1.3 Have company procedures and records been reviewed and updated where necessary to meet the requirements of the new MCERTS standard?
-
2.1 What is the current issue number of the CSA Sira's guidance document?
-
2.2 Has it changed since the previous external QMS visit?
-
2.3 Have company procedures and records been reviewed and updated where necessary to meet the requirements of the new guidance?
-
3.1 What is the current EA permit number/revision/issue date?
-
3.2 Has it changed since the previous external QMS visit
-
3.3 Do the changes affect liquid discharge conditions, daily volume discharge limits, discharge flow rate limits, requirements for continuous flow monitoring?
-
3.4 What is the current consent number/revision level/issue date?
-
3.5 Has it changed since the previous external QMS visit
-
3.6 Do the changes affect liquid discharge conditions, daily volume discharge limits, discharge flow rate limits, requirements for continuous flow monitoring?
-
3.7 Have processes and records been revised to reflect changes in liquid discharge conditions?
-
3.8 Are there copies of the most recent site Inspection Report and MCERTS Inspection Certificate available?
-
3.9 Does the MCERTS Inspection Certificate carry a valid renewal date and accurate details from the EPR Permit and supporting Site Inspection Report?
-
3.10 If the Site Inspection Report contains any recommendation for change to the maintenance or verification activities made by the site inspector, have they been completed?
-
4.1 Do you have a copy of a company policy statement which includes a commitment from the organisation to comply with applicable environmental legislation; authorised by someone in authority within the organisation?
-
4.2 Are MCERTS responsibilities documented?
-
4.3 Are there training records for people with MCERTS responsibilities?
-
4.4 How did the MCERTS-responsible person acquire the skills and competence necessary for the role?
-
4.5 Is the MCERTS Management System documented and has it been updated?
-
4.6 Is there a copy of the certificate for the company's documented management system (ISO9001/14001, etc.)
-
4.7 Is there a copy of the certificate for the company's documented management system (ISO9001/14001 etc.)?
-
4.8 Have any been any changes to the flow measurement equipment since the last QMS visit?
-
4.9 If the certificate covers a group of sites/companies, is the address of this site recorded on the certificate or on a supplementary page?
-
4.10 Are all the operating procedures required to support MCERTS been changed since the previous external MCERTS QMS visit?
-
4.11 Is the current version of the MCERTS Management System and supporting documentation, correctly identified and authorised?
-
4.12 Have there been any changes to the flow measurement equipment since the last QMS visit?
-
4.13 Are all new flow measurement instruments MCERTS certified (on the list of MCERTS-certified instruments at the time of purchase)?
-
4.14 Is the inventory of flow measurement equipment documented and up-to-date?
-
4.15 Is a copy of the manufacturer's calibration certificate available?
-
4.16 Are maintenance activities documented and taking place in accordance with the schedule?
-
4.17 Are records of the maintenance activities available and have they been correctly completed?
-
4.18 Do observations in the maintenance records support the frequency of maintenance activities?
-
4.18.1 If there are no maintenance observations, on what evidence have the frequencies of maintenance activities been based?@
-
4.19 Are records of maintenance activities retained for 5 years
-
4.19.1 How far do records go back?
-
4.20 Has any new liquid flow measurement equipment installed to monitor the final discharge been subjected to a site inspection?
-
4.21 If a new liquid flow meter has been purchased since April 2010, is there a copy of the MCERTS certificate for the new flow meter?
-
4.22 Have records of reviews of site changes been retained?
-
4.23 Have any reviews identified the need for additional work before the implementation of the change?
-
4.24 Have any reviews identified the need for a further visit from a site inspector?
-
4.25 Are records of verification activities being retained?
-
4.26 Does the frequency of verification comply with the scheme requirement (at least once between site inspection visits)?
-
4.27 Is the verification method used on site listed in section 4.13.2 of the MCERTS standard?
-
4.28 Is the verification method appropriate to the measurement structure(s) installed on site to monitor liquid discharges from the permitted/consented locations?
-
4.29 Are records of daily volume and discharge flow being created in accordance with permit requirement?
-
4.30 Is analysis taking place in a timely manner?
-
4.31 Are records readily available and retained for at least 5 years?
-
4.
-
4.31.1 How long are records retained for?
-
4.32 Are there any breaches of permit conditions?
-
4.32.1 Are breaches of permit conditions reported to the EA regulator in accordance with the timescale in the permit?
-
4.32.2 Do breaches of permit conditions enter the corrective action process?
-
4.33 Are records of corrective actions being retained?
-
4.34 Has the effectiveness of corrective actions been assessed?
-
4.35 For how long are records of corrective actions retained?
-
4.36Are audits of discharge flow measurement activities taking place in accordance with the guidance (frequency and scope)?
-
4.37 How is the auditor impartiality maintained?
-
4.38 Is there sufficient time between internal and external QMS audits for corrective actions to be completed?
-
4.39 Are audit reports and findings documented in accordance with the supporting company processes?