Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Ironworkers
Rebar
-
Are all additional bars installed around MEP openings/sleeves?
-
Are all stair top/bottom dowels sticking out of pour with sufficient lap splices?
-
Is all top bar epoxy coated?
Carpenters
-
Are all construction joints in place with any necessary key-way and holes for steel dowels?
-
Have all beams been checked for hardware to prevent blow out? (Ties, jahn-a clamps, kickers, wing nuts, bulkheads etc.)
-
Have all handrails been adjusted to remain 42" above the deck AFTER concrete is poured, and is toe board installed?
Engineer
-
Have all embeds, stud rails and anchor bolts been installed according to the embed/stud rail/anchor bolt drawing?
-
Has all grading of the deck been planned or completed, including cambers, column shortening, pitches and slopes?
Finishers
-
Are all slab slopes/pitches/high points and low points marked out and shown to the finisher foreman?
-
Is the finished product light broom.
-
Are nosings flush and in proper location?
Laborers / Clean-up
-
Have all scraps (2x4s, rebar, garbage) been picked up off the deck?
-
Has deck been blown and vacuumed?
Signature of Checklist auditor
-
Add signature