Information
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
STOP AND THINK
-
Do we have the required skills and knowledge to do the job safely?
-
Do we have the correct PPE?
-
Do we understand the steps required to do the work?
-
Do we have a safe work procedure for the job?
-
IF ANY OF THESE ARE UNCHECKED DO NOT PROCEED AND SEE YOUR MANAGER
HAZARDS
-
Are you at risk from operation of plant or machinery?
JOB HAZARD ANALYSIS
Checklist items for the Task being conducted
-
Spotter required
-
Barricading
-
Traffic Management
-
Working at Heights
-
Confine Space Entry
-
Signage
-
Machinery/ Personnel Interface
-
Emergency PLan
-
Scaffolding
-
Hazardous Materials (MSDS)
-
Manual Handling
Type of Work Permits (tick appropriate)
-
Confined Space
-
Excavation/ Dig Permit
-
Working at Heights
-
Work near Powerlines
-
Permit to Work
Type of Personnel Protection Equipment (PPE) required (Tick appropriate)
-
Hi-Vis Vest
-
Safety Glasses
-
Safety Helmet
-
Hearing Protection
-
Drinking Water
-
Sun Protection
-
PVC Plastic Coveralls
-
Full Face Shield
-
Respiratory Protection
-
Safety Harness (heights)
-
Rubber Boots
-
List the Tasks/ Activities of the job in the space below with the associated Hazards and Inherent Risk Rating
-
Task/ Activity 1:
-
Existing and Potential Hazards (associated with task 1)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Control Measures Task 1 (Implement to reduce the level of risk to acceptable levels)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Task/ Activity 2:
-
Existing and Potential Hazards (associated with task 2)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Control Measures Task 2 (Implement to reduce the level of risk to acceptable levels)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Task/ Activity 3:
-
Existing/ Potential Hazards associated with Task 3
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Control Measures Task 3 (Implement to reduce the level of risk to acceptable levels)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Task/ Activity 4:
-
Existing and Potential Hazards (associated with task 4)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Control Measures Task 4 (Implement to reduce the level of risk to acceptable levels)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Task/ Activity 5:
-
Existing and Potential Hazards (associated with task 5)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Control Measures Task 5 (Implement to reduce the level of risk to acceptable levels)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Task/ Activity 6:
-
Existing and Potential Hazards (associated with task 6)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Control Measures Task 6 (Implement to reduce the level of risk to acceptable levels)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Are you working on or near a road?
-
Refer to the following NZTA website for instructions specifically section D7.6 "Inspections and non-invasive works" JHA to be completed.
https://www.nzta.govt.nz/assets/resources/code-temp-traffic-management/docs/Section-D-mobile-operations-copttm-4th-ed-july2015.pdf
JOB HAZARD ANALYSIS
Checklist items for the Task being conducted
-
Spotter required
-
Barricading
-
Traffic Management
-
Working at Heights
-
Confine Space Entry
-
Signage
-
Machinery/ Personnel Interface
-
Emergency PLan
-
Scaffolding
-
Hazardous Materials (MSDS)
-
Manual Handling
Type of Work Permits (tick appropriate)
-
Confined Space
-
Excavation/ Dig Permit
-
Working at Heights
-
Work near Powerlines
-
Permit to Work
Type of Personnel Protection Equipment (PPE) required (Tick appropriate)
-
Hi-Vis Vest
-
Safety Glasses
-
Safety Helmet
-
Hearing Protection
-
Drinking Water
-
Sun Protection
-
PVC Plastic Coveralls
-
Full Face Shield
-
Respiratory Protection
-
Safety Harness (heights)
-
Rubber Boots
-
List the Tasks/ Activities of the job in the space below with the associated Hazards and Inherent Risk Rating
-
Task/ Activity 1:
-
Existing and Potential Hazards (associated with task 1)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Control Measures Task 1 (Implement to reduce the level of risk to acceptable levels)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Task/ Activity 2:
-
Existing and Potential Hazards (associated with task 2)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Control Measures Task 2 (Implement to reduce the level of risk to acceptable levels)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Task/ Activity 3
-
Existing and Potential Hazards (associated with task 3)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Control Measures Task 3 (Implement to reduce the level of risk to acceptable levels)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Task/ Activity 4:
-
Existing and Potential Hazards (associated with task 4)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Control Measures Task 4 (Implement to reduce the level of risk to acceptable levels)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Will you be working near water (over 1m deep)?
JOB HAZARD ANALYSIS
Checklist items for the Task being conducted
-
Spotter required
-
Barricading
-
Traffic Management
-
Working at Heights
-
Confine Space Entry
-
Signage
-
Machinery/ Personnel Interface
-
Emergency PLan
-
Scaffolding
-
Hazardous Materials (MSDS)
-
Manual Handling
Type of Work Permits (tick appropriate)
-
Confined Space
-
Excavation/ Dig Permit
-
Working at Heights
-
Work near Powerlines
-
Permit to Work
Type of Personnel Protection Equipment (PPE) required (Tick appropriate)
-
Hi-Vis Vest
-
Safety Glasses
-
Safety Helmet
-
Hearing Protection
-
Drinking Water
-
Sun Protection
-
PVC Plastic Coveralls
-
Full Face Shield
-
Respiratory Protection
-
Safety Harness (heights)
-
Rubber Boots
-
List the Tasks/ Activities of the job in the space below with the associated Hazards and Inherent Risk Rating
-
Task/ Activity 1:
-
Existing and Potential Hazards (associated with task 1)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Control Measures Task 1 (Implement to reduce the level of risk to acceptable levels)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Task/ Activity 2:
-
Existing and Potential Hazards (associated with task 2)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Control Measures Task 2 (Implement to reduce the level of risk to acceptable levels)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Task/ Activity 3:
-
Existing and Potential Hazards (associated with task 3)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Control Measures task 3 (Implement to reduce the level of risk to acceptable levels)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Task/ Activity 4:
-
Existing and Potential Hazards (associated with task 4)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Control Measures task 4 (Implement to reduce the level of risk to acceptable levels)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Task/Activity 5:
-
Existing and Potential Hazards (associated with task 5)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Control Measures task 5 (Implement to reduce the level of risk to acceptable levels)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Task/ Activity 6:
-
Existing and Potential Hazards (associated with task 6)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Control Measures task 6 (Implement to reduce the level of risk to acceptable levels)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Will you be working near open trenches deeper than 1m?
JOB HAZARD ANALYSIS
Checklist items for the Task being conducted
-
Spotter required
-
Barricading
-
Traffic Management
-
Working at Heights
-
Confine Space Entry
-
Signage
-
Machinery/ Personnel Interface
-
Emergency PLan
-
Scaffolding
-
Hazardous Materials (MSDS)
-
Manual Handling
Type of Work Permits (tick appropriate)
-
Confined Space
-
Excavation/ Dig Permit
-
Working at Heights
-
Work near Powerlines
-
Permit to Work
Type of Personnel Protection Equipment (PPE) required (Tick appropriate)
-
Hi-Vis Vest
-
Safety Glasses
-
Safety Helmet
-
Hearing Protection
-
Drinking Water
-
Sun Protection
-
PVC Plastic Coveralls
-
Full Face Shield
-
Respiratory Protection
-
Safety Harness (heights)
-
Rubber Boots
-
List the Tasks/ Activities of the job in the space below with the associated Hazards and Inherent Risk Rating
-
Task/ Activity 1:
-
Existing and Potential Hazards (associated with task 1)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Task/ Activity 2:
-
Existing and Potential Hazards (associated with task 2)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Control Measures task 2 (Implement to reduce the level of risk to acceptable levels)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Task/ Activity 3:
-
Existing and Potential Hazards (associated with task 3)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Control Measures task 3 (Implement to reduce the level of risk to acceptable levels)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Task/ Activity 4:
-
Existing and Potential Hazards (associated with task 4)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Control Measures task 4 (Implement to reduce the level of risk to acceptable levels)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Task/Activity 5:
-
Existing and Potential Hazards (associated with task 5)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Control Measures task 5 (Implement to reduce the level of risk to acceptable levels)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Task/ Activity 6:
-
Existing and Potential Hazards (associated with task 6)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Control Measures task 6 (implement to reduce the level of risk to acceptable levels)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Will you be working at height or confined space?
JOB HAZARD ANALYSIS
Checklist items for the Task being conducted
-
Spotter required
-
Barricading
-
Traffic Management
-
Working at Heights
-
Confine Space Entry
-
Signage
-
Machinery/ Personnel Interface
-
Emergency PLan
-
Scaffolding
-
Hazardous Materials (MSDS)
-
Manual Handling
Type of Work Permits (tick appropriate)
-
Confined Space
-
Excavation/ Dig Permit
-
Working at Heights
-
Work near Powerlines
-
Permit to Work
Type of Personnel Protection Equipment (PPE) required (Tick appropriate)
-
Hi-Vis Vest
-
Safety Glasses
-
Safety Helmet
-
Hearing Protection
-
Drinking Water
-
Sun Protection
-
PVC Plastic Coveralls
-
Full Face Shield
-
Respiratory Protection
-
Safety Harness (heights)
-
Rubber Boots
-
List the Tasks/ Activities of the job in the space below with the associated Hazards and Inherent Risk Rating
-
Task/ Activity 1:
-
Existing and Potential Hazards (associated with task 1)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Control Measures task 1 (Implement to reduce the level of risk to acceptable levels)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Task/ Activity 2:
-
Existing and Potential Hazards (associated with task 2)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Control Measures task 2 (Implement to reduce the level of risk to acceptable levels)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Task/ Activity 3:
-
Existing and Potential Hazards (associated with task 3)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Control Measures task 3 (Implement to reduce the level of risk to acceptable levels)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Task/ Activity 4:
-
Existing and Potential Hazards (associated with task 4)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Control Measures task 4 (Implement to reduce the level of risk to acceptable levels)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Task/Activity 5:
-
Existing and Potential Hazards (associated with task 5)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Control Measures task 5 (Implement to reduce the level of risk to acceptable levels)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Task/ Activity 6:
-
Existing and Potential Hazards (associated with task 6)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Control Measures task 6 (Implement to reduce the level of risk to acceptable levels)
-
Likelihood
-
Consequence
-
Moderate Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Moderate Risk
-
High Risk
-
High Risk
-
Extreme Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
-
Consequence
-
Low Risk
-
Low Risk
-
Moderate
-
High Risk
-
High Risk
HAZARDS-OTHER
-
Slips Trips Falls
-
High Voltage Lines
-
Railways
-
Equipment/ Tools (slashers, peg bars)
-
Pedestrians/Public
-
Climbing Fences
-
Ground Penetration
-
Hazardous Chemicals
-
Traffic
-
Animal Hazards
-
Sun
-
Add signature