Information

  • McPherson40-modified.jpg
  • Project Name

  • City /State
  • Date

  • Superintendent

Site Audit

1. Working at Heights

  • 1.1 All edges with a 6 foot fall risk are protected with handrails at 42” to withstand 200lbs horizontally with 21” midrail and toeboard?

  • Photos Required!

  • 1.2 Is a fall protection system being utilized while workers exceed heights over 6 feet?

  • Photos Required!

2. Small Tools and Equipment

  • 2.1 Laser Warning signs are displayed when lasers are in use?

  • 2.2 Workers operating powder actuated tools possess the proper training card for the equipment?

3. Scaffolds

  • 3.1 Scaffolding is erected properly. Daily inspections are documented and scaffolding is tagged with current status of Red, Yellow, or Green.

  • Photos Required! (Scaffolding Tag and Scaffold)

  • Additional Notes

4. Trenching

  • Please Click This Radio Button If trenching operations are present on the job?

  • 4.1 Competent Person completing daily inspection?

  • 4.2 Employees protected from cave-in by protective system?

  • Please explain why workers are allowed to work while unprotected

  • Photos Required!

  • 4.3 Sloping/Benching adequate for soil type?

  • 4.4 Spoils/Material/Equipment set back 2 feet from trenching edge

  • Photos Required!

  • 4.5 Safe & Proper means of access & egress with a travel distance of no more than 25 feet?

  • PHOTOS REQUIRED!

  • 4.6 Utilities located & identified prior to the start of excavation?

  • 4.7 Water runoff controlled to prevent accumulation?

5. Job Site Record Book

  • 5.1 "Toolbox Talks" being discussed & signed?<br>

  • Please Type the Toolbox topic for the week.

  • (Take Picture of Signed "Toolbox Talk" )

  • 5.2 All individual daily documents being filled out on job site daily? (Skid Loader, Scissor Lift, JLG, Cranes, Welding Machines, Rod Oven, Daily Sling Inspection, Scaffolding Inspection) <br>

  • Please Explain why daily documents are not being filled out daily.

6. Ladders

  • 6.1 Ladders are in good condition?

  • 6.2 Stepladders are used only in the fully opened position without standing on the top or the first rung below the top?

  • 6.3 Straight ladders are set at the proper angle, extend 3 feet above the landing surface and are tied off at the top?

  • Additional Notes

7. Hazardous Chemical (including fuel and oil)

  • 7.1 Flammables are properly stored away from ignition sources or where spills could enter stormwater drains. etc?

  • 7.2 Compressed gas cylinders are all secured. Flammable and non-flammable cylinders are stored a minimum of 20 feet from each other?

  • 7.3 All containers on-site are properly labeled of their contents?

  • 7.4 Large propane tanks are protected by large visual cones; barricaded where adjacent to traffic?

  • Photos Required!

  • Additional Notes

8. Emergency Response

  • 8.1 All workers have been trained on emergency procedures. Procedures are displayed. Emergency maps are displayed on each building level?

  • Please explain why workers have not been educated on safety procedures

  • 8.2 Adequate first aid kits available. An eye wash station is located on the jobsite?

9. Personal Protective Equipment (PPE)

  • 9.1 Adequate PPE sun protection, hardhats, eye glasses, high visibility safety shirts or vests, long pants, masks, sturdy leather work boots; steel toe where required, and gloves are utilized by each worker or visitor on site?

  • 9.2 Is Fall Protection being monitored and used properly?

  • Corrective Actions

  • Explain other corrective actions

  • Photos Required!

  • 9.3 All PFAS (Personal Fall Arrest Systems) have been inspected and are in good condition with no found discrepancies?

  • Please use the slider to rate the condition of PFAS (1 being "Excellent" and 10 being "Poor").

  • Please take a pictures of questionable PFAS.

  • Additional Notes

10. Work Environment

  • 10.1 Adequate toilet facilities are provided and maintained?

  • 10.2 Functioning temporary lighting is provided in all work areas, bulbs are protected, lights and cords are suspended at least 8 feet above the floor. Strings of lights get power from circuits not providing power to other uses?

  • 10.3 Inside work areas are clean and organized?

  • Photos Required!

  • 10.4 Exterior site areas are clean and organized?

  • Photos Required!

11. Electrical Hazards

  • 11.1 Electrical cords are at least 12 gauge, contain proper grounding plugs and are undamaged?

  • 11.2 ALL extension cords are protected with GFCI protection?

  • 11.3 Overhead electrical lines are protected from accidental contact?

  • 11.4 All temporary electrical panel boxes are current with their monthly GFCI inspections?

  • 11.5 Electrical cords are protected from equipment being driven on them?

12. Environmental Hazards

  • 12.1 An effective vehicle tracking pad is in place that prevents tracking mud or dirt onto public or private streets?

  • 12.2 The erosion control log is up to date?

  • 12.3 All storm water systems and devices are in place to prevent on-site contaminates from entering the storm water?

13. Welding

  • Is "welding operations" currently being performed on your Job? (Click Switch if "Yes")

  • 13.1 Fire extinguisher in reach of ANY and all Hot Work?<br>

  • 13.2 Spark containment (Fire Blankets, Welding Screens)<br>

  • 13.3 Welding leads in good condition?<br>

  • Please use the slider to rate quality of the welding leads (1 being "Excellent" and 10 being "Poor").

  • Please take a picture of the questionable welding leads.

14. Hot Work

  • 14.1 Have you filled out your "Hot Work" permits for the day?

  • Photos Required!

  • Please explain why "Hot Work" is performed on the jobsite without permit(s).

  • "Hot Work" areas are free from flammable hazards?

  • Please explain why the "Hot Work" area(s) in question contain flammable material(s)

  • Has a "Fire Watch" been assigned for the current work area(s)?

  • Please explain why "Fire Watch" notices are not assigned to "Hot Work" area(s).

15. Fire Extinguishers

  • 15.1 Are fire extinguishers located a minimum of 1 per every 3000sf throughout project job site?

  • Photos Required!

16. Potential Hazards for Upcoming Week

  • 16.1 First time crew members on site?<br>

  • Type name of Crew Member

  • Do they understand scope of work, hazards, and procedures?<br>

  • Please explain why this new team member has not been informed of safety procedures.

  • 16.2 Potential hazards for upcoming week? (Tap at right to select multiple options)

  • Manually Enter "Other" potential hazards.

17. Positive Observations

  • Enter any "positive" safety actions taken this week onsite.

  • Add photos of "positive" safety items onsite. "These pictures should consist of safe items that reflect positively onsite"

18. Sign Off

  • Did you notify anyone onsite of unsafe work practices as part of this audit.

  • Name of individual(s) or Company(s) that had to be notified of unsafe work practices.

  • McPherson Contractors, Inc. appreciates your efforts and dedication to safety. This hard work is invaluable to our organization, subcontractors & employees. Getting them home safely is our first priority.

  • Print and Sign.

  • !!Don't forget to use the export feature when exporting this audit, and copy to your Project Manager, Assistant Project Manager and Project Assistant!!

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.