Title Page
-
Project Name
-
Project Number
-
Site Address
-
Apartment No.
-
Floor
-
Project Phase
-
Date and Time
-
Prepared by
-
Work area kept clear of Materials and waste
-
Work Area checked and satisfactory Cylinder room , in line with drawings
-
Water main installed to Cylinder cupboard
-
MVHR fitted correctly
-
Hot & Cold to kitcheninstalled
-
All vent installed & flex'sfitted
-
All vent joints are taped
-
All Fire collars are fitted
-
Copper pipe installed to left side in cylinder cupboard ( state change)
-
pressure test pipework above ceiling
-
Signed to signify acceptance of the Area: -
-
Drayton Beaumont (Print Name and Signature)
-
Client (Print Name and Signature)