Title Page

  • Site Name / Site Number

Indoor unit

  • 1. Clean and Check filter

  • 2. Check coil Condition

  • 7. Clean unit facia

  • 8. Check operation

  • 9.Check pipework for signs of leaks/lagging condition

Outdoor Unit

  • 11. Check coil and brush

  • 13. Check unit operation

  • 14. Check unit external condition

  • 16. Check external surfaces and pipework for signs of leaks/lagging condition

  • 18. On completion of visit add the following text to sap job sheet " PPM completed in accordance with Epta PPM spec UKPPM032 Rev 01"

  • 19. Obtain client signature

  • 20.Update Verisae

  • 21. Send IAudit PPM sheet to Service3@eptarefrigeration.com

Condition report of AC systems

  • Please add pictures of Ac System condition

  • Please add details/report of AC system condition

Sign Off

  • Engineers name

  • Engineers sign off

  • Site sign off name

  • Site signature

  • Time/date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.