Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
DRYWALL/FRAMING
-
Rated walls properly labeled
-
Top-of-Wall sealed correctly
-
Top-of-Wall fire-taped and mudded
-
Drywall continuous to deck
-
Firewall built correctly (check corners)
-
Top and bottom track attached
-
1" deflection at top track (2" track)
-
No screws in D-track
-
Door frame (door swing, plumb)
-
Blocking complete and correct
-
Framing around openings (duct, window, etc)
-
Framing around door frames (door clips, lead-lined openings, etc)
ELECTRICAL
-
Knockouts sealed
-
Boxes at proper heights and locations
-
Boxes level / plumb
-
Putty pads installed on boxes
-
Ground wire installed
-
Conduit/boxes properly supported
-
Conduit located inside wall
-
Conduit turns out of wall above ceiling height
-
MC Cable properly supported
-
OFE rough-ins confirmed
FIRE CAULKING
-
Fire caulk adequate
-
Acoustical caulk adequate
-
In-wall floor penetrations properly fire caulked
PLUMBING
-
Pipe and clamp inside walls
-
Pipes stubbed above ceiling height
-
Pipes insulated
-
Pipes properly supported
-
Pipes through floor and walls properly sealed
-
Rough-ins coordinated with casework & sinks
-
Med Gas boxes a correct heights and locations
-
No dissimilar materials touching
-
ADA clearances confirmed
-
OFE Rough-in confirmed