Message Stick IT Equipment Install & Completion Checklist

  • Conducted on

  • Company Name

  • Location
  • Room Name

Objective:<br>This checklist guides efficient IT equipment installation, ensuring all phases from preparation to client approval are covered.<br><br>Scope:<br>It includes pre-installation prep, hardware setup, initial configuration, testing, documentation, and post-installation support, aiming to streamline the process and ensure client satisfaction.

Pre-Installation:

  • 1. ASSESSMENT AND PLANNING: o Confirm project scope and site readiness. o Review installation guidelines from manufacturers.

  • 2. EQUIPMENT PROCUREMENT: o All IT equipment has been ordered and received. (e.g., model numbers, quantities).

  • 3. DOCUMENTATION: o Review equipment manuals and warranty information. o Prepare installation and configuration guides.

Site Preparation:

  • 1. SITE SURVEY: o Assess physical and network environments. o Ensure power sources and mounting options are adequate.

  • 2. NETWORK SETUP: o Network connections, Security Protocols, Access permissions and cabling are in place.

Installation:

  • 1. HARDWARE INSTALLATION: o Inspect, unpack, and install equipment. o Connect and secure cables.

  • 2. SOFTWARE INSTALLATION: o Install operating systems and configure settings.

  • 3. TESTING: o Perform initial functionality and connectivity tests. o Address any issues or errors.

Asset and Equipment Information:

  • o Asset Tag Number:

  • o Asset Tag Number:

  • o Asset Tag Number:

  • o Asset Tag Number:

  • o Asset Tag Number:

Photographs:

  • 1. Front View of System:

  • 2. View from Door to VC System:

  • 3. View from Back of Room to VC System:

  • 4. Underside of Meeting Table:

  • 5. Cable Management Between Screen & Codec:

  • 6. Hearing Augmentation:

  • 7. Cable Raceways / Carpet Velcro:

Final Checks and Adjustments:

  • 1. EQUIPMENT PLACEMENT: o Ensure proper positioning per guidelines.

  • 2. CLEANING o Wipe all marks and fingerprints from the Webex board and Touch 10 controller.

  • 3. QUICK REFERENCE GUIDE: o The quick reference guide is present.

  • 4. CABLE MANAGEMENT: o Secure and tidy cables; check for damage

  • 5. TOUCH SCREEN WEBEX BOARDS: o The pen/stylus is present and functional.

  • 6. WEBEX TEST CALL: o Test audio levels, content sharing, and speaker tracking.

Post-Installation:

  • 1. DOCUMENTATION o Update inventory and installation records.

  • 2. TRAINING AND HANDOVER: o Train end-users and provide documentation

  • 3. FINAL INSPECTION: o Conduct a walkthrough to resolve any issues.

  • 4. SUPPORT AND MAINTENANCE: o Schedule follow-up support and provide contact info.

Notes

  • undefined

Completion Statement:

  • This checklist has been completed in accordance with the installation requirements.

  • Name

  • Date & Time

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.