Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
PRE INSPECTION
-
Equipment and/or Energy Control Procedure:
-
Has employee received proper training as an authorized employee?
-
Review procedures. Are procedures for the equipment current?
-
Was the employee able to locate procedures?
-
Does the employee understand the procedure?
LOTO STEPS (DE-ENERGIZE)- Did employee:
-
Notify all affected employees?
-
Deactivate all energy sources in order?
-
Lock/Tag all energy sources in proper order?
-
Dissipate or restrain stored energy?
-
Use assigned Lock/Tag device?
-
Verify all energy sources have been locked out?
LOTO STEPS (RE-ENERGIZE) - Did employee:
-
Return controls to neutral position?
-
Removed tools and ensured guarding was back in place?
-
Notify affected employees prior to restoring power?
-
Energized equipment properly?
Inspection Verification
-
As the inspector do you feel based on this inspection the employee is competent with the lockout procedures and does not need to be retrained?
-
Add signature