Title Page
-
Site conducted
-
Conducted on
-
Prepared by
Untitled Page
-
PRE-SHIFT INSPECTION: Before use each day or at the beginning of each shift, the aerial platform shall be given a visual inspection and functional test including but not limited to the following:
-
Operating and emergency controls
-
Safety devices
-
Personal protective devices, including fall protection
-
Air, hydraulic and fuel systems leaks
-
Cables and wiring harness
-
Loose or missing parts
-
Tires and wheels
-
Placards, warnings, control markings and operating manual(s)
-
Outriggers, stabilizers, extendible axles and other structures
-
Guard rail system
-
Items specified by manufacturer
-
Note anything abnormal or in need of repair:
-
Operator’s Name or I.D. #:
-
Date:
-
Shift:
-
Hr. Meter Reading:
-
Equipment I.D. #: