Information
-
Client / Site
-
Area details
-
Conducted on
-
Prepared by
Site Conditions
Subfloor Type
-
-
Add media
-
Details
-
Are the Ceramics securely fixed ?
-
Details Of Screed Required?
-
Has A Visual Inspection Been Carried Out?
-
Detail why?
-
Is It Suitable to accept Floor Coverings?
-
Go To Actions Required Section
-
Are the boards/ planks flat, level and suitable to accept floor coverings
-
Add media
Surface Texture
-
The Surface Texture is
-
Add media
-
Add media
Moisture
-
Is A Moisture Test Required ?
-
Witness Details
Additional Comments
-
Add media
Actions Required Prior To Starting On Site?
-
The Client/Main Contractor Has Been Informed
All The Above Is Completed And Correct
-
Add signature